China Power Test Equipment manufacturer
Zhengzhou Great Electric Co.,Ltd.
Grow with our partner n the wordwide
6
Home > Products > Meter Test Bench >

0.2 Class Automatic Water Meter Test Bench 10 Meters Positions

0.2 Class Automatic Water Meter Test Bench 10 Meters Positions

Brand Name HNMC
Model Number MCS15-25
Place of Origin China
Minimum Order Quantity 1
Payment Terms L/C, T/T, Western Union, MoneyGram
Delivery Time 4-8weeks
Packaging Details wooden package10 meters serial connection fully-automatic water meter test bench ( camera type volumetric method)
Pressure-tight test 0-2MPa
Pressure Tank 0.5m³
Storage Tank 1m³
Pump Q=6.3m³/h H=50m N=3.7Kw
Flow Range 0.016m³/h~6.3m³/h
Class 0.20%
Vessel 10L/20L 50L/100L
Glass Rotameter DN15/25
Detailed Product Description

3 meters serial connection semi-automatic water meter test bench

 

1. Main technical index

1.1 accuracy : 0.2 class

1.2 water meter diameter and number (single line)

¢15×6,¢20×5,¢25×4,¢40×3,¢50×3

1.3 water supply pressure :0.3~0.5MPa;outlet pressure≥30kPa

1.4 flow range:4L/h~40m3 /h

1.5 instantaneous flow meter specification:

DN15(glass rotameter) 4~125L/h

DN25(glass rotameter) 120~1400L/h

DN50(glass rotameter) 1.4~9m3/h

1.6. Measure vessel volume: (10L-20L 100L-500L)

1.7. clamp stretch distance : (≥80mm(pneumatic))

1.8. straight pipe length: (serial connection 2D)

1.9. Measure vessel thickness: 10L-20L≥1.5mm 100L-500L ≥3mm

1.10.work platform thickness :≥3mm

1.11.measure vessel platform thickness: ≥3mm

1.12.pipe thickness:≥3.5mm

1.13.withstand pressure test : 0—2.0MPa

1.14. Valve specification: copper

1.15. material 304

2,Match 0.5m3vortex stabilizer technical index

2.1. volume: 0.3m3;

2.2.work pressure :0.3- 0.4MPa, test pressure: >0.6MPa,;

2.3.stainless material: thickness:3mm

3,Water tank (option)

3.1. volume: 2m3

3.2. stainless material : thickness≥1.5mm

4, water pump(option)

4.1 Model:KQL80/200-7.5/2 1No Q=43.5m3/h;H=38m;N=7.5kw

 

 

 

1. Turn on the pump

2. Put the METER under test in the verified position

3. Open all valves 1,2,3,4,5,6 to drain the air from the pipe

4. Close valves 3, 4, 5 and 6

5. Read the initial value v1 of the testing meter

6. Manually open one of the valves 3,4,5,6 according to the flow point and adjust to the corresponding flow point

7. Wait for the flow to reach the position of the meter. For example, open valve 3 when verifying Q1, and then wait for the volume to reach 10L.And read the final value V2 of the checked table

8. Read the value Vi on the standard gauge

9. Calculation error

 

 

 