China Steel Structure Warehouse manufacturer
Qingdao Ruly Steel Engineering Co.,Ltd
One-stop service for steel structure project
8
Home > Products > Steel Structure Workshop >

Q235B Prefabricated Steel Structure Workshop with 50 Year Lifespan

Browse Categories

Qingdao Ruly Steel Engineering Co.,Ltd

City: qingdao

Province/State:shandong

Country/Region:china

Tel:86--18661691560

Contact Person:
Mr.steven
View Contact Details

Q235B Prefabricated Steel Structure Workshop with 50 Year Lifespan

Brand Name Ruly Steel
Model Number Ruly0272
Certification SGS, BV, ISO
Place of Origin China
Minimum Order Quantity 300 Square Meter
Price USD29-USD99 Per Square Meter
Payment Terms L/C,T/T,Western Union
Supply Ability 20000 Square Meter Per Month
Delivery Time 30 Days
Packaging Details Steel frame pallets and loaded into 40’HQ
Application Prefabricated Workshop Buildings , Industrial Steel Framed Buildings
Type Pre Engineered Steel Structure
Raw steel material Q235B, Q355B, ASTM A36
Service life 50 Years
Working scope Design,Fabrication, Installation
Columns & Beams H-section steel
Surface treatment Painting or Hot-dip Galvanize
Standard AISC, ASTM, BS, DIN, GB, JIS
Detailed Product Description

Prefabricated Workshop Buildings / Industrial Steel Framed Buildings

 

Project introduction:

Prefabricated steel structure has good seismic resistance, which is suitable for high-rise buildings. Prefabricated steel structure is mainly made of steel beam, steel column, steel truss and other components made of section steel and steel plate. The welding seam, bolts or rivets are usually used between the components or components.Widely used in large factories, venues, high-rise, residential and other fields.

 

Specification of steel structure material:

 

Main steel frameH-section steelQ355 steel 8mm to 10mm
WeldingAutomatic Submerged Arc Welding
Rust removingSand blasting
surface processingAlkyd Paint or galvanized
High strength boltGrade 10.9
Supporting systemAngle braceL50x4,Steel Q235,Process and painting
Cross bracingdia.20 round bar,Steel Q235, process and painting
Tie bardia.89*3 round pipe,Steel Q235 Process and painting
Batter bracedia.12 round bar,Steel Q235 process and painting
Ordinary boltGalvanized bolt
RoofPurlinC160*60*2.5,steel Q235,Painting or galvanized
Out-roof panelSandwich panel or corrugated steel plate
Transparent skylight6mm thick PVC
AccessoriesSealant,self-tapping screw, etc.
Edge coverMade of color steel sheet thickness 0.5mm
GutterMade of steel sheet thickness 0.8mm, or PVC
Rinspoutdia.110 PVC
WallPurlinC160*60*2.5,steel Q235,paint
 Wall panelSandwich panel or corrugated steel plate
 AccessoriesSealant,self-tapping screw etc
 Edge coverMade of color steel sheet thickness 0.5mm
Ventilator unpowered axial-flow ventilator or monitor roof
Door & window Rolling door/sliding door, PVC/alu. alloy window
Crane With or without crane, ranging from 5 tons to 20 tons

 

Steel structure engineering is a structure mainly made of steel. It is mainly composed of steel beams, steel columns, steel trusses and other components made of section steel and steel plates. The connection between each component or component is usually connected by welding seam, bolts or rivets.Because of its light weight and simple construction, it is widely used in large factories, Bridges, stadiums, super high-rise buildings and other fields.

 

The design of the workshop

 

 

 

Advantages of steel structure workshop

 

 

1. The dead weight of steel structure is light

2. The reliability of steel structure is high

3, steel vibration resistance (shock), impact resistance is good

4, steel structure manufacturing of a higher degree of industrialization

5, steel structure can be accurately and quickly assembled

6. Large interior space of steel structure

7, easy to make a sealing structure

Product Tags: Q235B Steel Structure Workshop   8mm Steel Structure Workshop   Q235B Steel Framed Buildings  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Qingdao Ruly Steel Engineering Co.,Ltd
Subject:
Message:
Characters Remaining: (80/3000)