Powder metallurgy cemented carbide Pressure Sintering Furnace 6MPA 1600℃
|
|
Powder metallurgy cemented carbide Gas Pressure Sintering Furnace 6MPA 1600℃
Zhuzhou Ruideer Intelligent Thermal Equipment Co.,Ltd located in Ruideer Technology Park,Tianyuan District,Zhuzhou Hunan Province,founded in 2011,covering an area of more than 19,000 square meters. At present,Ruideer has developed two core technologies of “high temperature &high pressure”and “chemical vapor deposition” with supplying vacuum sintering furnaceand CVD coating furnace. Our main products including:GPS furnace,MIM vacuum sintering furnace,ceramic silicon carbide/nitride sintering furnace,silicon carbide coating furnace,cemented carbide cutting tool CVD coating furnace and the turnkey solution for the cemented carbide cutting tool(From RDP powder,press machine,sinter furnace,cuuting machine,laser machine,metalgraphic testing instruments,sandblasting matchine,ultrosonic cleaning machine to CVD coating furnace). The Gas Pressure Sintering Furnace(GPS furnace) has been awarded National Manufacturing Champion Product,widily used in cemented carbide,non-cermets,semiconductor,aerospace,automobile manufacturing,weapons and other fields,exported to the US,Russia,Japan,EU,Ukraine,South Korea,Vietnam and other countries,which making Ruideer a well-known brand in the industry.
Powder metallurgy is a process that uses metal powders (or mixtures of metal and non-metal powders) as raw materials to manufacture metallic materials, composite materials, and various types of products through forming and sintering. Because powder metallurgy shares similarities with ceramic production, it is also called the cermet method. Sintering is a key process in powder metallurgy. After forming, the pressed blank or billet achieves the desired physical and mechanical properties through sintering. Sintering is divided into single-system sintering and multi-system sintering. In solid-phase sintering, whether single-system or multi-system, the sintering temperature is lower than the melting point of the contained metals and alloys; while in liquid-phase sintering of multi-systems, the sintering temperature is lower than the melting point of the refractory components but higher than the melting point of the fusible components. Generally, sintering is carried out under a protective atmosphere. Besides ordinary sintering methods, there are also loose-pack sintering, melt infiltration (infiltrating metal into the sintering framework), and hot pressing (combining pressing and sintering).
The main parameters for the equipment:
Problems in the sintering process of cemented carbide tools.
1. Excessive carbon in the alloy, i.e. the cobalt magnetism of the mixture itself is high or even carburized, carbon in carbon paper is absorbed, residual paraffin is cracked, and the insulation layer absorbs paraffin, resulting in a high concentration of carbon atmosphere, etc. 2. Insufficient carbon in the alloy, i.e. the cobalt magnetism of the mixture itself is low, the pressed product is stored for too long, the furnace leaks, the contact material is used incorrectly, etc. 3. High concentration of carbon-containing gas enters the weak parts of the product (the edges and corners of the product are often low in density or have severe elastic aftereffect), and under the contact of cobalt, a carbon precipitation reaction occurs. The precipitated carbon destroys the continuity of the alloy, causing the alloy to "peel" 4. The density of the pressed product is uneven; the carbon content in different parts of the sintered body is different; the boat is uneven, the sintering atmosphere is uneven, and the sintering temperature is uneven 5. Overburning - the sintering temperature is too high; there are oxides in the pressed green sheet that are difficult to reduce, and they can only be reduced at a higher temperature after the liquid phase appears. The pressure of the gas generated by the reduction is greater than the resistance of the liquid phase contraction; the debris in the pressed green sheet, such as alloy debris, iron filings, copper wire, etc. 6. The gas generated by the reduction of oxide impurities at high temperature or the furnace gas entering the sintered body, when the alloy solidifies, it does not have time to escape, and it is dispersed and remains in the alloy, and the pressure of the gas is not enough to form bubbles and become holes 7. The gas generated by the reduction of oxide impurities at high temperature or the furnace gas entering the sintered body, when the alloy solidifies, it does not have time to escape, and it is dispersed and remains in the alloy, and the pressure of the gas is not enough to form bubbles and become holes.
More about differences between Sinter HIP Furnace and Gas Pressure Sintering Furnace Main functions description:
Equipment strengths:
Documents of Equipment and Technical Files
Buyer’s Preparation
Design standards
The equipment is designed in accordance with the pressure vessel requirements of the Quality and Technical Supervision Bureau, and is qualified after pressure testing and shipped. The electrical design and construction meet national standards.
Horizontal and vertical options are available:
Installation pre-test and pre-acceptance
The equipment is fully assembled in our factory, including all pipelines, vacuum pipelines, process gas pipelines, cooling water pipelines, compressed air pipelines, etc. Pre-testing can be carried out after installation. At the customer site, pipelines other than the equipment are provided by the customer. The installation also includes the connection of all cables. At the customer site, the main cable connecting the power cabinet is provided by the customer. After installation, we conduct vacuum and positive pressure leakage tests on the entire equipment, as well as mechanical and electrical function tests.
Disassembly and transportation
The equipment will be disassembled in several large parts, packed in a standardized wooden cases, and loaded into the transport vehicle.
Customer site installation and commissioning
The Redeer after-sales engineer will lead the team to complete commissioning, product trial burning and other work within 20 working days. The customer needs to make appropriate preparations and provide the necessary tools, such as hoisting and lifting equipment. And provide installation personnel support (it is recommended to have 1 mechanical personnel and 1 electrical personnel).
Final acceptance
After installation and commissioning, the equipment can be finally accepted in accordance with the requirements of the technical contract.
Training
Our after-sales engineers will provide a systematic and complete on-site training, including operation, maintenance, troubleshooting, etc.
Technical data delivery
To ensure safe operation and equipment maintenance, the following technical data will be provided to customers:
1. Equipment installation layout 2. User manual 3. Spare parts list 4. Electrical drawings 5. Component manual
FAQ Q: Are you a factory or trading company?A:We are China leading high-temperature vacuum furnace manufacturer with over 15 years’ experience. Q: Do you have customization or OEM service?A:Yes,we have powerful R&D team and high-tech equipment.So we can not only supply the regular model,but also the customizable furnace as the repuirment of our clients. What's your advantage?Q:What's your advantage? A: l Quick response to your enquiry l High quality control l Stable supply chain l Timely delivery l Excellent after-sales service
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Product Tags: 6MPA carbide pressure sintering furnace 1600℃ gas pressure sintering furnace powder metallurgy sintering furnace with warranty | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Turn-key project of Cemented/tungsten Carbide Cutting Tool with Intelligent Gas Pressure Sintering Furnace |
|
Gas Pressure Sintering GPS furnace with energy cost reducing 25% |
|
Hot Isostatic Pressing sintering furnace with high temperature/high pressure/Inert gas protection |
|
Powder metallurgy cemented carbide Pressure Sintering Furnace 6MPA 1600℃ |
|
Chinese Supplier Tungsten carbide High Temperature Gas Pressure Sintering Furnace 1-20MPA |
|
Horizontal Vacuum Compression Furnace Uniform Temperature Atmosphere and Precise Sintering for Industrial Standards |