120KVA Break Point Reheating Horizontal Vacuum Sintering Furnace
|
|
400*400*1200 vacuum sintering furnace with vacuum sintering and rapid cooling function
Equipment function:
Equipment system:
Design standards:
General equipment requirements:
Technical parameters of equipment
After sales: 1. Installation, Commissioning and Acceptance We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard. The equipment shipped to the buyer, the seller received the buyer's
notification, both within a week to carry the equipment out of the
box together, then check the equipment and all components according
to the packing list . Including equipment accessories, spare parts
and special tools, attached manual and technical documents, etc. It
can be installed after the acceptance check of equipment.
2. Training When taking-over the Furnace to the customer, We will give a staff
training to customer. The operating personnel of the customer
should join to commission,test the furnace, when installing at
customer’s company.
3. Warranty period The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
|
|||||||||||||||||||||||
| Product Tags: Break Point Reheating Vacuum Sintering Furnace 120KVA Horizontal Vacuum Sintering Furnace 120KVA Horizontal Vacuum Furnace |
|
12 Months Period High Vacuum Furnace with Graphite Resistence Heating Rod and UPS Guarantee Time of 80 Minutes |
|
1550C High Temperature Vacuum Brazing Furnace for Three-phase Five Wire System 380V 50HZ Control Power Supply |
|
High Temperature Vacuum Furnace 1550C Max Working Temperature and 20 Years Service Life for Industrial Applications |
|
ISO CE Certified High Vacuum Furnace for Three-phase Five Wire System 380V 50HZ Control Power Supply Max.Temperature 1600C |
|
Maximum Load of 1500Kg High Temperature Vacuum Sintering Furnace with Max.Working Temperature of 1550C |
|
120KVA Break Point Reheating Horizontal Vacuum Sintering Furnace |