China Antminer Bitcoin Miner manufacturer
Chengdu Chenxiyu Technology Co., Ltd.,
Mining one time, miner lifetime.
4
Home > Products > Antminer Bitcoin Miner >

CE FCC 75db Ethernet Antminer S19 95Th 4 Fans

Browse Categories

Chengdu Chenxiyu Technology Co., Ltd.,

City: chengdu

Province/State:sichuan

Country/Region:china

Tel:86-19980599845

View Contact Details

CE FCC 75db Ethernet Antminer S19 95Th 4 Fans

Brand Name Bitmain Antminer
Model Number S19 (95Th)
Certification Ce,Fcc
Place of Origin Guangdong, China
Minimum Order Quantity 1
Price $4,999.00 - $11,999.00/Sets
Payment Terms D/A, D/P, T/T, Western Union, USDT, ALIPAY
Supply Ability 500 sets per Month
Delivery Time 5-8 work days
Packaging Details Single Packing in Carton
Algorithm SHA-256
Item Name Antminer S19 (95Th)
Manufacturer Bitmain Antminer
Power 3250W±5%
Hashrate 95Th/s±5%
Coin Type BTC BCH BSV
Products Status Stock, Brand New
Interface Ethernet
Warranty(Year) 1 year for new
Port shenzhen
Net Weight 14500g
Noise level 75db
Fans 4
Temperature 5-40
humidity 5-95%±5%
Detailed Product Description
Antminer S19 95Th Bitmain Mining SHA-256 Algorithm Maximum Hash Asic BTC Miner Mining Machine S19 Antminer Bitcoin Miner

Specifications

ManufacturerBitmain
ModelAntminer S19 (95Th)
ReleaseMay 2020
Size195 x 290 x 400mm
Weight14500g
Noise level75db
Fan(s)4
Power3250W
InterfaceEthernet
Temperature5 - 40 °C
Humidity5 - 95 %

Product Information

 

Advantages of S19

SHA-256 algorithm for mining BTC, BCH, Prizm, Litecoin Cash, and many other coins. This model, in comparison with previous versions, is even more efficient. Another advantage of the new ASIC is increased stability. The machine is equipped with an APW12 power supply and an updated firmware. The mining process goes even better due to the new control mechanisms. Buyers of new ASICs will also receive a power supply in the kit. Engineers worked hard on this element. As a result of their work, an effective device was obtained that increases the stability of the device.

 

Profitability

According to averaged data, the ASIC will bring its owner up to $ 10 a day (electricity payments already excluded). The initial return calculation is 7-8 months. These indicators are affected by the exchange rate, the cost of electricity, and other parameters. To provide a convenient way to calculate the future profit we have implemented a calculator of profitability. You can also submit a form and our experts will do it for you.

 

Price Notes

1, Since the prices and goods condition changes everyday, please reconfirm the REAL-TIME price when you placing the order.
2, Products pictures on our website are shown for customers reference, the real one maybe a little different due to different light environment or display.

 

Power Notes

1, Domestic default voltage is 220V in China, if your country or farming with different voltage standard, please make clearly about the power requirements before purchasing,

2, If it is necessary to match an adapter according to the real power supply, please buy it on your market.

 

Operating Notes

1-1, In low power mode, max hashrate should be typ hash rate*103%,

1-2, Min condition:25℃,Min J/TH, typical hashrate. MAX condition: 40℃,Max J/TH, max hashrate.

1-3, Caution: wrong input voltage may probably cause miner damaged.

1-4, Typ condition: min reference power, typical AC input voltage. Max condition:max reference power, min AC input voltage.

 

1-5, including PSU size,

1-6, including PSU weight,

1-7, max condition: Fan is under max RPM(rotation per minute)

 

Shipment Notes

1, Please provide your detailed delivery address, correct phone number and email, so that we can contact you timely when there is any problem.

 

2, We offer many kinds of shipping method, one is standard shipping ( speed pack & local post office shipping),which takes about 10-15 days , the other is expedited shipping (UPS/DHL/FeDex),which take about 5-10 days at least.

 

3, We will send item out within 3-7 working days after your payment finish it the item in the warehouse.

 

4, If the item is preorder item or the item is super big item and we will ship out 2-1 package. If you receive one package first, please don’t worry ,just wait for the second package.

 

5, If there is any problem with the item or something wrong with the item WHEN you receiving the package, please contact us promptly , and we will do our best to help you, best wishes.

 

6, Custom duty is on the buyers’ , please tell us if you have special request on the marking price ahead, so that we can try to mark down the price of ordered item when submit to the customs.

 

7, If the item is broken when you received it and please do NOT sign for this item, you should contact us first, we will do our best to help you.

 

8, We suggest our customers to buy the new& verifiable and original mining machines!

8-1, Because the second hand miners without warranty generally, or the warranty has expired. We can provide paid maintenance service.

8-2, Second hand miners are not allowed to be return, replacement or refund.

8-3 The shipping with remote distance, please carefully check the situation of the package avoid the loss due to the freight.

8-4 Some parts maybe get loosen due to the very distance freight, please ask professional person who be familiar with this field to check or repair.

 

Payment Notes

1, We accept payment in RMB,USD,USDT via T/T bank transfer, MoneyGram, Credit Card, Western Union, Cash, Alipay, Usdt;

2, 100% payment before delivery, 60% deposit prepay for futures order, at least 30% deposit prepay for inspect the goods at spot ;

3, The buyers are responsible for any tax and/or duty charge by their country, but we can mark it as a low value item and mark down price of ordered item.

4, We appreciate prompt payment and look forward to your more business in the future.

 

Welcome to Contact us

1, If you have any question or suggestion, please email us or leave message immediately, your message will be answered with 24 hours.

2, We will try our best to solve your problem to your satisfaction.

3, Phone/WeChat/ WhatsAPP: +86 18628 330339, Cathy C.

 

 

 

Product Tags: 75db Ethernet Antminer S19 95Th   CE FCC Antminer S19 95Th   4 Fans s19 95th miner  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Chengdu Chenxiyu Technology Co., Ltd.,
Subject:
Message:
Characters Remaining: (80/3000)