Galvanized Steel Roof Purlins For Components Construction Warehouse
BuildingSteel frame structure bulidings has lots advantages compared with
concrete building such as high strength, large span, simple
construction, short construction period: all components are
prefabricated in the factory, the site is simply assembled, thus
greatly shortening the construction period, a 6000 square meters of
buildings, only 40 days to complete the basic
installation.Beautiful and practical: the steel structure building
line is simple and smooth, has the modern feeling.Color wall panels
are available in a variety of colors, and other materials can be
used for the wall, so it is more flexible.Reasonable cost: the
steel structure building is light in weight, which reduces the
basic cost, and the construction speed is fast, which can be
completed and put into production as soon as possible. The
comprehensive economic benefit is much better than the concrete
structure building. | Dimension | Length x Width x Eave height/ Ridge height | | Frame type | Portal frame, multi-story frame | | Main frame | Hot-rolled or Welded H beam and column, Q355B steel | | Bracing components | Tie bar, staying bar, Horizontal bracing, Column bracing | | Cladding system | Corrugated color steel sheet, sandwich panel with glass wool, rock
wool,PU insulation | | Accessory | Ridge tile, trim, Gutter, Down pipe,skylight, clerestory | | Door | Sliding door, Roll up door, industrial section door, swing door | | Window | PVC window, aluminum window, metal louver |
We always take "high quality, fast installation, attractive looks,
practical use" as design concept and "credibility and quality
oriented" as management concept to restrain and regulate ourselves.
LANGE will spare no efforts to provide you most appropriate
solution and reliable project quality. You are welcomed to visit
our factory and establish business relations.
|