China UV CIPP Equipment manufacturer
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
4
Home > Products > UV CIPP Equipment >

Sewers UV CIPP Equipment Pipe Relining Integrated Renovation Mobile System

Browse Categories

Daoyunai Energy Saving Technology Limited

City: shanghai

Province/State:shanghai

Country/Region:china

Tel:86-136-4196-7601

Contact Person:
Mr.Aaron Wang
View Contact Details

Sewers UV CIPP Equipment Pipe Relining Integrated Renovation Mobile System

Brand Name DAO
Model Number D919
Place of Origin Jiangsu, China
Minimum Order Quantity 1 unit
Price Variable
Payment Terms T/T
Supply Ability 15 units per month
Delivery Time 15 working days
Packaging Details Upon requirement
Function Sewer repair NO-DIG
Section 6
Cable reel 200m
Lamb LED or mercury
Range For DN200-1650
Speed 0.1-2m/min
Color Custom
Material Stainless steel
Detailed Product Description

Integrated Cured-In-Place-Pipe CIPP UV cure renovation mobile system for sewers

 

The integrated UV truck is for underground sewers repair by the Cured-in-Place-Pipe process. Daoyunai, as the OEM and ODM manufacturer, designer, and also supplier, is willing to work together with friends from all over the world to make our home better, our land green, and our waters blue.

 

DAO Company culture:

Vision: build a "green mountains and green waters" unimpeded pipeline, make the world proud made in China

Mission: help customers reduce costs, help customers improve efficiency

Core values: achieve customers: listen to the customer site, change with the customer's needs, etc. respect: respect each other, think with empathy, promote oneself, open up and work together to embrace change

 

The UV curing method is to blow high-pressure gas into the material dragged into the pipe in advance to keep it close to the inner wall of the pipe, and then use the UV curing equipment to continuously irradiate the material with UV light to cure it.

The construction is convenient, and the material can react after being irradiated by light, without preheating.


Materials are put into the pipeline in advance to simplify the construction steps;
The construction is safe. The whole reaction process of materials is carried out in the pipeline without personnel going down the well.
The whole construction process is not affected by seasons and regions.

 

Light Specifications
Diameter rangeDN250-1650
LightHigh Voltage Mercury or LED available, 2 groups of light chains, 8 bulbs.
TemperatureEquipped with two temperature sensors (optical convenience 20:1, measurement accuracy ± 1%)

 

Product Tags: sewers CIPP UV Equipment DAO   uv cured sewer linings DAO   cipp pipe relining  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Daoyunai Energy Saving Technology Limited
Subject:
Message:
Characters Remaining: (80/3000)