HVM Vertical Raw Mill In Cement Plant Low Energy Consumption 800kw
|
Low Energy Consumption Vertical Mill For Cement / Slag / Raw Material / Coal Grinding Mill
The main components of cement raw meal are generally limestone, clay, iron powder, etc. The raw materials are mixed according to a certain proportion and then crushed and ground, and the finished product is cement raw meal. According to whether it contains coal or not, cement raw meal is divided into white raw meal (without coal), black raw meal (with coal) and semi-black raw meal (with some coal). Raw meal containing coal is generally used in shaft kilns. There are many kinds of cement raw meal production processes, such as dry, wet, semi-dry and semi-wet. Large-scale raw meal vertical mill is a good choice for dry cement raw meal preparation.
The cement raw meal is calcined at high temperature in a rotary kiln or a shaft kiln, resulting in a series of chemical reactions to generate clinker with calcium carbonate as the main component. Cement clinker plus a certain proportion of gypsum or other mixed materials are ground by a large vertical mill, and finally turned into a finished cement product. Hengcheng's large-scale raw meal vertical mill and large-scale clinker vertical mill are reliable production equipment for cement plants, and have obvious advantages in increasing production and reducing consumption and environmental protection.
【Main features of the product】
3. Low comprehensive investment cost
4. Stable product quality
5. High reliability
6. Environmental protection
Specifications And Technical Parameters Of HVM Raw Vertical Mill
【An Introduction】
【Solution】
For the production of ultra-fine powder, the vertical mill should focus on the design and optimization of the powder separator. Due to the large resistance of powder selection at this time, it is necessary to strictly control the fineness, and to prevent large particles from running thick, excessive blade wear and tear. Problems such as abnormal vibration caused by large internal resistance of the mill. Therefore, for materials with different product fineness requirements, it is necessary to calculate and analyze the smoothness of materials and gases in the vertical mill, especially the part of the powder separator, according to the characteristics of the material, so as to determine a reasonable structure of the powder separator (such as the rotor form and the number and angle of blades, the number and angle of stationary blades), and at the same time, necessary auxiliary means should be taken to control (such as using a sealed fan for gas sealing to effectively control the running of large particles). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Product Tags: HVM Vertical Raw Mill 800kw Vertical Raw Mill HVM vertical raw mill in cement plant |
![]() |
Energy Saving Grinder Cement Raw Meal Vertical Grinding Mill 30-420t/H |
![]() |
HVM Series Vertical Raw Mill In Cement Plant Customizable |
![]() |
HVM Vertical Raw Mill In Cement Plant Low Energy Consumption 800kw |
![]() |
Energy Efficient Vertical Roller VRM Mill For Cement Slag Raw Material Coal |
![]() |
PLC VRM Vertical Raw Mill Grinding For Energy And Mining Industry |
![]() |
85-730T/H Cement Vertical Roller Mill plant For Raw Material Coal Quartz Grinding |