41 - 50 of 60
iso9001 biw design engineer
Selling leads|
Across Automobile D7 Automatic Welding Production Line Project 1. Project name Across Automobile D7 Automatic Welding Production Line Project 2. ...
2025-03-21 07:33:49
|
|
Chery S15 main production line project in Pakistan 1. Project name: Chery S15 main production line project in Pakistan 2. Project time: April 2020 3. ...
2025-03-21 07:33:49
|
|
High-end and pure electric light truck construction project UBS01 station of wide body welding line 1. Project name High-end and pure electric light ...
2024-12-09 18:10:44
|
|
S111 bodyside welding line Project introduction: S111 side wall automatic welding line. Two models, the left and right sides are in line, 30JPH, 26 ...
2024-12-09 18:10:44
|
|
Multi-model flexible welding line project 1. Project name Multi-model flexible welding line project 2. Project time October 2018 3. Project introducti...
2024-12-09 18:10:44
|
|
S7 rear floor automatic welding line Case highlights: 1. Mixed production of three types of floor assemblies, including S7 rear floor, M432 front and ...
2024-12-09 18:10:44
|
|
M432 rear floor sub assembly welding work island Case highlights: 1. Renovation of existing fixtures with low cost and short cycle; 2. There are many ...
2024-12-09 18:10:44
|
|
M4 Automotive underbody sub-assembly welding work island Case highlights: 1. Renovation of existing fixtures with low cost and short cycle; 2. There ...
2024-12-09 18:10:44
|
|
ZB21008-Changqing Changqing T11 automation import project 1. Project number: ZB21008 2. Project Name: Changqing Changqing T11 Automation Import ...
2024-12-09 18:10:44
|
|
Robot multi-model flexible rolling island project 1. Project name Robot multi-model flexible rolling island project 2. Project time April 2019 3. ...
2024-12-09 18:10:44
|