21 - 30 of 31
biw welding line for chery
Selling leads|
Flexible Floor Welding System 1. Process introduction: The floor welding line flexible system mainly completes the assembly and welding work of the ...
2024-12-09 18:10:44
|
|
Flexible bodyside welding system 1. Process introduction: The flexible system of the side wall welding line mainly completes the assembly and welding ...
2024-12-09 18:10:44
|
|
Flexible Main Line Welding System 1. Process introduction: The main welding wire flexible system is mainly to complete the assembly and welding work ...
2024-12-09 18:10:44
|
|
JMC project 1. Project name JMC project 2. Project time 2018.6 3. Project introduction Models: 4 models collinear Capacity: 33JPH Robot: KUKA Quantity...
2024-12-09 18:10:44
|
|
Across Automobile D7 Automatic Welding Production Line Project 1. Project name Across Automobile D7 Automatic Welding Production Line Project 2. ...
2025-03-21 07:33:49
|
|
Automotive AMB-Hop-line tool welding adjustment line flexible assembly tool solution The production site of the automobile adjustment line rings the ...
2025-03-21 07:33:45
|
|
ZB20018-BAIC off-road vehicle B40 welding side line automation upgrading project 1. Project name: ZB20018_Beijing Automobile Group Off-Road Vehicle Co...
2024-12-09 18:10:44
|
|
M432 rear floor sub assembly welding work island Case highlights: 1. Renovation of existing fixtures with low cost and short cycle; 2. There are many ...
2024-12-09 18:10:44
|
|
M4 Automotive underbody sub-assembly welding work island Case highlights: 1. Renovation of existing fixtures with low cost and short cycle; 2. There ...
2024-12-09 18:10:44
|
|
Body Welding Shop CEI specializes in comprehensive body shop engineering that transforms stamped metal components into the structural foundation of ...
2026-07-09 00:12:46
|
