OEM IoT Based Three Phase Energy Meter LoRaWAN Energy Management Platform
|
Detailed Product Description
TIMEWAVE IoT-based Three phases energy Management Platform with
Smart Metering and Visualization Type DTZY2397 (LoRaWAN) Three-phase IOT smart energy meter Electricity meter operating instruction 1. OVERVIEW The intelligent electricity meter has the functions of electric
energy measurement, power parameter measurement, time-sharing
measurement, real-time freezing, on-off control, LoRaWAN and RS485
communication,etc.It is suitable for three-phase power consumption
occasions.
3.1. 3.1 Metering positive and negative active power, positive and
negative direction active power, 1-4 quadrant reactive power, and
ABC phase separation active power and reactive power functions.
Electrical energy should be accumulated and stored separately for
electric energy and total electrical energy at each time period
such as tips, peaks, flats, and valleys. And it can also store and
display the power of the previous 12 months. 3.2. 3.2 It can measure, store and display the operating parameters
and states of ABC such as each phase voltage, current, total and
three-phase active reactive power, three-phase active reactive
power, total and three-phase power factor and frequency of the
current electricity meter. And it has overload protection function. 3.3 There are two sets of rates (sharp, peak, flat, valley) and
periods that can be programmed arbitrarily, and another set of
rates and periods can be start to used at the set time point. Each
set of rate time periods can be set with at least 2 time zones for
a year. At least 14 time periods can be set within 24 hours. The
minimum time period interval is 15 minutes. The time period can be
set across zero points. 3.4 Record the maximum demand and occurrence time of forward
active, reverse active, positive reactive and reverse active power
in that month. 3.5It has freezing functions such as instantaneous freezing,
regular freezing, daily freezing, agreed freezing and hour
freezing. 3.6 It has the function of event recording such as zero clearing,
programming, proofread, power down, pulling and closing the brake,
etc. 3.7 Remote disconnection and power transmission function. Power off
command is issued through communication interface such as RS485 to
cut off the user's load loop; Or issue a power transmission
instruction to turn on the user load loop. 3.8Active upload / bidirectional transparent transmission function.
Actively upload the data to the corresponding platform through the
LoRaWAN wireless network, with a default interval of 4 hours
(settable). 3.9 After the meter is powered on and the LoRaWAN module is
connected to the network, the meter is automatically calibrated. LCD full-screen display schematic diagram (as shown above) 4.2. Display items
l Overdraw indication: overdraft electricity when "surplus" seconds
flash, overdraft power off power when "surplus"speeds flash. l Out- of-phase indication: When ABC is out of phase, the
corresponding character of ABC in the lower row flashes seconds. l Wrong phase indication: this indicator seconds flashes when ABC
three-phase voltage is wrong phase; this indicator speeds flashes
when ABC three-phase current is wrong. This indicator does not
appear when there are missing phases. The electricity meter uses a bright, long-life LED as a pulse
indicator light. It has active power pulse indicator light: red, usually go out,
flashing when measuring active power. It has reactive power pulse indicator light: red, usually go out,
flashing when measuring active power. Trip indicator light: yellow. Often out indicates the relay closed
state.Often bright indicates the relay off state. LoRaWAN module status indicator: green. Often bright indicates that
is online, flashing is going online. 5. APPEARANCE DESCRIPTION AND INSTALLATION WIRING 5.2. Wiring diagram 5.2.1 Weak current terminal wiring diagram NO: Tritrip trip N: The trip is public NC: Tritrip is often closed T +: High multifunction T-: Low multifunction A: The RS485 A line B: The RS485 B line P: Active pulse Q: reactive
pulse - -: Pulse Commons 5.2.2 Wiring diagram of the three-phase four-wire mutual inductance
table 5.2.3 Wiring diagram of three-phase four-wire straight-through
meter table 5.3. Installation The electricity meter shall be installed indoors as far as
possible. Special instrument box protection shall be used for
outdoor installation. The installation bottom plate shall be fixed
on the wall with strong fire resistance and not easy to vibration.
There must be no corrosive gases in the surrounding air where the
meter is installed. Avoid dust, salt spray, etc. When using the electricity meter, the wiring must be conducted
strictly according to the wiring diagram in the tail cover of the
meter. It is recommended to use copper wire for the lead connected
to the terminal seat. The screws of the fixed lead in the terminal
seat should be tightened to avoid burning the electricity meter due
to bad contact and heating. 6. TRANSPORTATION AND STORAGE Ammeters must be transported and stored under original packaging
conditions. Products shall not be severely impacted during
transportation and unpacking, and are transported and stored in
accordance with GB / T15464-1995 General Technical Conditions for
Instrument Packaging. The products should be stored in the
warehouse and placed on the platform frame. The stacking height
shall not exceed five layers. No corrosive gases shall be present
in the stored environment. 7. WARRANTY PERIOD AND AFTER-SALES SERVICE If the user complies with the transportation, storage and
installation operation specifications, and the lead seal of the
manufacturer is still complete.If there is a quality problem, our
company is responsible for free repair or replacement within 18
months from the date of delivery the electricity meter. During the whole life cycle of the products, our company implements
"three guarantees" for all electricity meter products, providing
necessary maintenance and services. Providing equipment wiring
diagram and necessary technical documents and drawings. According
to the requirements of users, provide necessary training for
maintenance personnel and operators. Providing training materials,
and update the software regularly and provide free upgrade. After receiving the service request of the product user, our
company will respond within 12 hours. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Product Tags: OEM Three Phase Energy Meter LoRaWAN Three Phase Energy Meter LoRaWAN Energy Management Platform |
Related Products
![]() |
ODM IoT Based Smart Three Phase Energy Meter Solution IEC62053-21 Standard |
![]() |
LoRaWAN Wireless Energy Meter 3 Phase Smart Energy Meter 220v Kwh Meter Home Energy Monitoring Devices |
![]() |
Lora Voltage Current Power Energy Meter Digital Multimeter LCD Power Meter 3 Phase |
![]() |
OEM IoT Based Three Phase Energy Meter LoRaWAN Energy Management Platform |
![]() |
Wireless Smart Three Phase Energy Meter Lorawan Wifi Communication Support 4G 2G |
![]() |
Smart 3 Phase Watt Hour Meter LoRa RF Wifi ANSI Socket Gprs Energy Meter |
Email to this supplier