China Steel Structure Building manufacturer
Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.
Focus on customer satisfaction, provide high quality steel structure buildings
2
Home > Products > Steel Structure Warehouse >

Prefabricated Industrial Warehouse Building Metal Factory Steel Structures Building

Browse Categories

Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.

City: qingdao

Province/State:shandong

Country/Region:china

Tel:86---15898860020

Contact Person:
Mrs.Della
View Contact Details

Prefabricated Industrial Warehouse Building Metal Factory Steel Structures Building

Brand Name XGZ
Model Number XGZ-SSW027
Certification ISO9001, CE
Place of Origin Qingdao, China
Minimum Order Quantity 100 square meters
Price USD 30-70 per square meter
Payment Terms T/T, L/C, Western Union, MoneyGram
Supply Ability 15000 tons per month
Delivery Time 30-55 days
Packaging Details Steel Pallet
Name Steel Structure Warehouse
Material Q235B/Q355B
Main Frame Welded H Steel Beam, Steel Truss
Secondary Frame C&Z Purlin, Brace
Wall Cladding Steel Color Sheet, Sandwich Panel
Roof Cladding Steel Color Sheet, Sandwich Panel
Surface Treatment Hot Dip Galvanized and Painted
Color Customized Color
Life Span 30-50 Years
Standard GB
Detailed Product Description

Prefabricated Industrial Warehouse Building Metal Factory Steel Structures Building

 

Product Description


Steel structure warehouse building are among the most affordable buildings to erect.
As all of the warehouse building materials are prefabricated, there will be no delay at the warehouse site. Each part of the steel frame fix together perfectly, as well as the steel panels as roof and wall cladding. This means it will cost less in labor to install the steel structure warehouse building, and there’s no excess building material to be wasted.

 

Product Specification


Components of steel structure building:

● Primary Framing Elements
Columns, beams members are made by H section steels( hot rolled section steel/ welded section steel), which will be easily bolted together at site. A factory primer and facing paintings or galvanization surface treatment are applied to get better anti-rusting effect of primary framing elements.
● Secondary Framing Elements
Purlin, tie bar are formed as secondary framing, which will fix on columns and beams by common bolts.
● Bracing
Round steel is supplied with knee bracing and other supporting parts that need portal framing, which will improve the stability and durability of the whole structural hangar.
● Cladding
Roof and Wall are covered by color-coated corrugated steel sheet or steel sandwich panel, hot dipped with zinc and aluminum compound, that is fixed to the outside of structural building to protect it against bad weather or to make it look more attractive and last for generations.
● Windows and Doors
Plastic Steel Window/Aluminum-alloy Window; Sliding Door/Folding Door.
● Other Options:
Gutter, Downpipe, Transparent sheet, Ventilator and Bridge Crane will be fitted according to client’s requirements.

ItemsSpecification
Main StructureFrame Column and BeamQ235, Q355 Welded H Section Steel
WeldingQ235, Q355 Welded H Section Steel
Rust RemovingShot Blasting
Surface ProcessingCoating or Galvanized
High Strength BoltGrade 10.9
Secondary StructurePurlinC/Z Purlin Size from C120-C320, Z100~Z300
Angle BraceQ235B L-Steel
Cross Brace/X BraceQ235B Round Pipe
Tie BarQ235B Round Bar
Roof SystemRoofing MaterialSandwich Panel-Insulated PU/ Glasswool/ Rock Wool/ EPS 50mm-200mm
Skylight Panel1.2mm FRP
GutterSteel Gutter Galvanized/ Coated 2.0mm-3.0mm
Rainspout/Down PipePVC Pipe
Wall SystemWall MaterialSandwich Panel-Insulated PU/ Glasswool/Rock Wool/ EPS 50mm-200mm
AccessoriesSealant, Self-tapping Screw etc
Edge CoverColor Steel
VentilatorUnpowered Axial-Flow Ventilator or Monitor RoofCustomizable
DoorElectric Rolling Door/Sliding Door/Access Side DoorCustomizable
WindowAluminum/PVCCustomizable
Crane1-200 TCustomizable

Our raw materials are ordered from one of China's largest steel mills, ensuring quality and timely delivery. With the strategic partnership, we can guarantee the reliability and consistency of the materials used in our products. Moreover, This collaboration allows us to streamline our production process, ensuring that we can meet project deadlines and deliver on time. 

 

Product Advantages


1-Durable and with long lifespan.
2-Short construction period than concrete and wooden building.
3-Low cost and reusable.
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.

 

Product Design


If you have drawings now, we can provide you with a quotation directly.

Alternatively, if you have a concept or ideas, we offer free design services for you. In order to assist you effectively, please provide us with the following details:

1. Location: Country and city
2. Size: Length*Width* Eave height
3. Wind load (max. Wind speed)
4. Snow load (max. Snow height)
5. Anti-earthquake level
6. Brick wall needed or not If yes, height
7. Thermal insulation, sandwich panel or corrugated steel sheet
8. Door quantity & size
9. Window quantity & size
10. Crane needed or not If yes, specification

 

Productive Process


The manufacturing process of a steel structure warehouse involves several key steps. Here are the main points:

1. Cutting

The steel materials are cut using advanced equipment such as laser cutting machines. These machines ensure precise and clean cuts, following the specific dimensions and shapes outlined in the design drawings.

2. Assemble

Skilled workers assemble the cut steel components according to the design specifications. Fourhydraulic positioning systems hold the upperand lower flange plates and webs of h-shaped steel members for positioning.

3. Welding

After assembled, it is hoisted into the gantry type submerged arc automatic welder for welding, and welding shall becarried out according to the specified welding sequence and welding specification parameters.

4. Rust Removal

Shot blasting and derusting of H steel and other shaped steel, welding members and steel plates. shot blasting to Sa2.5.

5. Surface Treatment

After welding, it will be painted or hot-dip galvanized according to customer's requirements.

 

Product Packaging


Our packaging and transportation methods are customized to meet the specific requirements of each product. Typically, we utilize pallets for packaging, and we also offer the option of bulk shipment, then the goods are loaded directly into shipping containers. These containers will be transported to the port. We follow FOB or CIF trade terms to ensure the safe and timely delivery of goods to our customers.

 

Project Process


To make a steel construction project is to start with the customer sending us an inquiry, there are several steps:

1. Contact us
Contact us by Phone/Email/WeChat
2. Drawing and Quotation
Tell us what you want, our sales man and designer give you the best proposal for your steel building project.
3. Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4. Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5. Inspection
QC team will make routine inspection in each process,and provide inspection report.
6. Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7. Install
We provide complete installation drawing,or we can send engineer to the site to give the installation guidance.
8. After-sale service
Anytime, any problem, our sales man and engineer will try our best to help your solve it.

 

FAQ


1. Is your company a factory or trade company?

We are factory, so you can get the best price and competitive price.

2. Do you offer designing service for us?

Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc

3. How to buy my idea products?

You can provide us your drawing, and we can produce as your drawings.
Or we can design as your requirements if you don’t have a clear plan. We will provide our plans according to the local climatic condition.

4. What's the payment term?

30% deposit is paid in advance, and the balance is paid before shipment; it can be negotiated according to specific projects.

5. Do you accept container loading inspection?

You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

 

Product Tags: Prefabricated Steel Structures Building   Prefabricated Industrial Warehouse Building   Metal Factory Steel Structures Building  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)