Modular Steel Bridge Description:
The GWD-Type bridge originated in Germany and was introduced into China for mass
production through the analysis of its structure by Great Wall
engineers.
The introduction of GWD-Type bridge stems from the technical barriers and deficiencies of Bailey
Bridge. As is known to all, Bailey Bridge is a common prefabricated
steel bridge structure, which is the upper and lower bearing bridge
beam with the single pin connecting truss unit as the main beam of
the bridge span structure, which has the advantages of simple
structure, strong adaptability and good interchangeability. But
even if the load is not large, it can only reach 60 meters per
single span.
Modular Steel Bridge Specifications:
Specifications: |
|
Single lane | Standard roadway: 4.2m | Single span: 35m-91m |
Double lane | Standard roadway:7.35m | Single span: 35m-91m |
Load: design according to different requirements |
|
Deck: steel deck / concrete deck |
Therefore, Evercross Bridge launched the GWD-Type bridge. Although
the truss adopts larger steel, the structure is simpler, which not
only has the advantage of strong adaptability of prefabricated
Bailey steel bridge, but also makes up for the limit of span,
improves the length of single span and saves the cost of bridge
pier.
Modular Steel Bridge Competitive Advantage:
Modular Steel Bridge Introduction
GW D Modular bridge is a standard bridge equipment, adopted
extensively and the most popular in the world