China Concrete Pump manufacturer
Changsha Potency Mechanical Technology Co., Ltd.
Dare to think and dare to do !
1
Home > Products > Arch Installation Trolley >

High Capacity Arch Assembly Machine for Tunnel - 12m Height, 1500Kg Load

Browse Categories

Changsha Potency Mechanical Technology Co., Ltd.

City: changsha

Province/State:hunan

Country/Region:china

Tel:86-731-85587557

Contact Person:
Ms.Selina
View Contact Details

High Capacity Arch Assembly Machine for Tunnel - 12m Height, 1500Kg Load

Brand Name POTENTIAL / POTENCY
Model Number KGJ312
Place of Origin CHINA
Certification ISO9001:2015
Minimum Order Quantity 1 Unit
Price Negotiable
Packaging Details FR or Bulk Ship
Delivery Time 45 working days
Payment Terms T/T, L/C
Supply Ability 120 units per year
Booms No. 3
Dual Power Diesel & Electric
Max.Operating Height 12m
Model Arch Installation Robot KGJ312
Maximum Load-bearing Capacity of The Main Arm 3000Kg
Maximum Load-bearing Capacity of The Auxiliary Arm 1500Kg
Transportation Dimension (L X W X H) 14000×3000×3450mm
Max.Operating Width 20m
Detailed Product Description

High Capacity Arch Assembly Machine for Tunnel 12m Max. Operating Height 1500Kg Load-bearing Capacity

Product Description:

According to the design requirements, the minimum excavation clearance section for the tunnel of the China Kyrgyzstan Uzbekistan Railway is 5 meters (width) * 6 meters (height). Currently, the arch installation trolley on the market is mainly used for arch operation in large and medium-sized tunnel sections, with a minimum operating range greater than 6 meters (width) * 6 meters (height).

In view of this, we recommend two sets of arch trolley construction plans for single track tunnels such as the China Kyrgyzstan Uzbekistan Railway.

 

Features:

It adopts an articulated chassis structure, with a small turning radius and strong flexibility, making it easy for equipment to operate in narrow spaces. The overall height is 3.7 meters, and it has strong height passability for secondary lining trolleys. Without a back arch function, the arch needs to be transported separately to the working face.

Upgrade and transform the structure of the boom to meet the construction design requirements of the China Kyrgyzstan Uzbekistan railway tunnel. When using the back arch function, the height of the secondary lining trolley should not be less than 4.2 meters to ensure the passability of the equipment.

 

Technical Parameters:

ModelArch Installation Robot KGJ312
Booms No.3
Dual PowerDiesel & Electric
Transportation Dimension (L X W X H)14000×3000×3450mm
Max. Operating Width20m
Maximum Load-bearing Capacity of The Main Arm3000Kg
Maximum Load-bearing Capacity of The Auxiliary Arm1500Kg
Max. Operating Height12m
 

Applications:

After improvement, KGM12300 can meet the minimum section of 5 meters (width) * 6 meters (height) for vertical arch operation. Multiple arches of Unit A can be carried by oneself, but the height of the secondary lining trolley is required to be no less than 4.2 meters.

The above two options can be selected according to the actual on-site situation of the China Kyrgyzstan Uzbekistan railway tunnel.

 

Friendly reminder: According to the analysis of the cross-sectional data of the China Kyrgyzstan Uzbekistan railway tunnel, other construction equipment should also have the characteristics of small volume, flexible turning, and flexible deployment of the boom in the tunnel, such as wet spraying machines and drilling and anchoring integrated machines.


Support and Services:

Our Product Technical Support team is available to assist you with any questions or issues you may have regarding the Arch Installation Trolley. Whether you need help with assembly, troubleshooting, or maintenance, our knowledgeable team is here to provide you with the assistance you need.

In addition to our Technical Support, we also offer a range of services to help you get the most out of your Arch Installation Trolley. Our team can provide training sessions, on-site assistance, and customized solutions to meet your specific needs.

 

Packing and Shipping:

Product Packaging:

The Arch Installation Trolley is carefully packaged in a sturdy cardboard box to ensure safe transportation. The trolley is securely wrapped in protective foam to prevent any damage during shipping.

Shipping:

Orders for the Arch Installation Trolley are processed and shipped within 1-2 business days. We offer standard and expedited shipping options to ensure you receive your trolley in a timely manner. Once your order is shipped, you will receive a tracking number to monitor the delivery status of your package.

 

FAQ:

Q: What is the brand name of the Arch Installation Trolley product?

A: The brand name of the Arch Installation Trolley product is POTENTIAL / POTENCY.

Q: What is the model number of the Arch Installation Trolley product?

A: The model number of the Arch Installation Trolley product is KGJ312.

Q: Where is the Arch Installation Trolley product manufactured?

A: The Arch Installation Trolley product is manufactured in CHINA.

Q: What certification does the Arch Installation Trolley product hold?

A: The Arch Installation Trolley product holds the ISO9001:2015 certification.

Q: What are the payment terms for purchasing the Arch Installation Trolley product?

A: The payment terms for purchasing the Arch Installation Trolley product are T/T and L/C.

Product Tags: High capacity arch machine   12m height tunnel equipment   1500kg load assembly trolley  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Changsha Potency Mechanical Technology Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)