China Steel Structure Workshop manufacturer
China CT Steel Structure Group Co., Ltd.
1
Home > Products > Steel Structure Warehouse >

Carbon Fast Assemble Steel Structure Metal Frame Warehouse Building

Carbon Fast Assemble Steel Structure Metal Frame Warehouse Building

Brand Name China CT
Model Number Steel Structure Warehouse
Certification ISO CE
Place of Origin China
Minimum Order Quantity 500M²
Price USD 30-250 / M²
Payment Terms T/T, L/C
Supply Ability 200,000 Tons / Year
Delivery Time 20-40 Days
Packaging Details Standard Packing
Surface Painted/Galvanized
Connect Bolt/Weld
Raw Steel Material Q235B, Q355B, ASTM A36
Country Of Origin China
Roof Cladding Corrugated Steel Sheet/Sandwich Panel
Roofing Sandwich Panel, Single Steel Sheet
Main Structure Low Carbon Steel Q235 Q345
Purlins And Girts Cold rolled C or Z steel, Q355 or Q235
Imodel Number steel structure
Certifications ISO 9001, CE
Doors Sliding/roller door
Multi Story how many floors/with mezzanine
Detailed Product Description

Fast Assemble Steel Structure Metal Frame Warehouse Building

 

Quick Assembly: The fast assemble design allows for rapid on-site construction, significantly reducing project timelines and labor costs.
High Strength: The metal frame is made from high-strength steel, ensuring robust load-bearing capacity and long-term durability.
Modular Design: The warehouse building features a modular structure, offering flexibility in size and layout to accommodate various storage needs.
Cost-Effective: Prefabricated components and efficient assembly processes make it an economical solution for large-scale warehousing.
Resilience: The steel structure is highly resistant to environmental factors such as corrosion, fire, and seismic activity, ensuring safety and longevity.

 

FAQ
1. You are manufacturer or trading company?
We are a manufacturer. And welcome to visit us at any time. The quality control flow and sales team will show you
our professionalism. Also you will can get best and most competitive price after visiting us.

2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with best quality. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.

4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, supermarket, auto dealer shop, shipping mall, 5 star hotel.

6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after
receiving deposit.

Product Tags: Carbon Metal Frame Warehouse Building   Carbon Steel Structure Frame Warehouse   Fast Assemble Warehouse  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: China CT Steel Structure Group Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)