China Crawler Crane manufacturer
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
1
Home > Products > 300T Crawler Crane >

XGC 300t Crawler Crane Xcmg For Large Projects

Browse Categories

Shandong Tengfei Hoisting Engineering Co., Ltd.

City: zibo

Province/State:shandong

Country/Region:china

Tel:86-0533-7975775

Contact Person:
Mr.Gong
View Contact Details

XGC 300t Crawler Crane Xcmg For Large Projects

Brand Name XCMG
Model Number XGC 300t
Place of Origin China
Minimum Order Quantity One Crane
Price Negotiable Price
Payment Terms L/C,T/T
Supply Ability Supply According to Customer Needs
Delivery Time According to Order Confirmation
Packaging Details Packing According to Customer Requirements
Max. Lifting Height 120m
Maximum Lifting Capacity 300 tons
Maximum Radius 80 m
Max. Gradeability 30%
Crawler Length 10.5 m
Model XGC300
Boom Length 18-96m
Maximum Tip Height 152 m
Counterweight 100 tons
Max. Line Speed 120m/min
Fuel Tank Capacity 1,500 liters
Max. Slewing Speed 1.5rpm
Detailed Product Description

 

Crawler Crane 1.5m-4.5m Arm Connection Sections And Main Boom Assembly For 300t Max Rated Lifting Capacity.

XGC 300t(-I)Crawler Crane Technical Specifications


Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m

 

Shield working conditions

 

A. Shield working conditions_main boom section combination table
 

Name and quantity  Main boom assembly

Main boom bottom section 10.5m

Main boom middle section 3m

Main boom middle section 6m

Main boom middle section 12mA

Main boom tapered section 7m

Main arm connection section 1.5

Boom pulley block

HB19

1

0

0

0

1

1

1

HB22

1

1

0

0

1

1

1

HB25

1

2[0]

0[1]

0

1

1

1

HB28

1

3[1]

0[1]

0

1

1

1

HB31

1

2[0]

1[0]

0[1]

1

1

1

 

Notes:

1.The rear pull plates of the tower arm need to be removed from each boom section, and the guide pulleys for the tower arm need to be removed from the main boom reducer section.

2.Two main boom intermediate sections 3m can be used to replace one main boom intermediate section 6m, or two main boom intermediate sections 3m and one main boom intermediate section 6m can be used to replace one main boom intermediate section 12mA. When replacing, attention must be paid to the matching of the number of pull plates and pins.

 

B. Shield working conditions_Shield auxiliary arm section combination table

 

Name and quantity 
Shield arm assembly

Shield arm bottom section4.5m

Shield arm middle section 3m

Shield arm middle section 6m

Shield arm top section 2.5m

Shield arm single pulley

F(S) 7

1

0

0

1

(1)

F(S)10

1

1

0

1

(1)

 

Notes:

1. (S) ---- indicates the optional single pulley of the shield jib [single pulley of the shield arm and single pulley of the fixed jib].

2. The shield jib section is common to the fixed jib section.

3. To ensure the maximum function of the arm combination, it is recommended that users choose to purchase the shield jib length of 7m.
 

C. Shield working condition arm table
 

Turntable counterweight 115t + vehicle body counterweight 40t

Main boom length

Shield arm length

HB19

HB22

HB25

HB28

HB31

F(S) 7

F(S)10

 

Notes:

1. “●” - The boom can be raised.

2. The rear pull plates of the tower arm need to be removed from each boom section, and the guide pulleys for installing the tower arm need to be removed from the main boom reducer.

3. A 260t hook is recommended for the main boom and a 160t hook is recommended for the shield auxiliary boom.

4. When raising the boom, please place the crawler drive wheel behind the vehicle body.

Product Tags: 300t crawler crane xcmg   large projects crawler crane xcmg  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Shandong Tengfei Hoisting Engineering Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)