China Crawler Crane manufacturer
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
2
Home > Products > 300T Crawler Crane >

2nd Xcmg 4000t Crawler Crane For Urban Infrastructure Construction And Maintenance

Browse Categories

Shandong Tengfei Hoisting Engineering Co., Ltd.

City: zibo

Province/State:shandong

Country/Region:china

Tel:86-0533-7975775

Contact Person:
Mr.Gong
View Contact Details

2nd Xcmg 4000t Crawler Crane For Urban Infrastructure Construction And Maintenance

Brand Name XCMG
Model Number XGC 300t
Place of Origin China
Minimum Order Quantity One Crane
Price Negotiable Price
Payment Terms L/C,T/T
Supply Ability Supply According to Customer Needs
Delivery Time According to Order Confirmation
Packaging Details Packing According to Customer Requirements
Max Line Speed 120 m/min
Maximum Radius 80 m
Maximum Travel Speed 1.5 km/h
Counterweight 100 tons
Engine Power 447 kW
Maximum Line Speed 120 m/min
Rated Power 298 kW
Max Lifting Capacity 300 tons
Boom Length 18-84 meters
Track Shoe Width 1,200 mm
Max Torque 1,700 Nm
Maximum Tip Height 152 m
Detailed Product Description

XGC 300t(-I)Crawler Crane Technical Specifications


Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m

 

Fixed jib condition

 

A.Fixed jib working condition_main boom section combination table

 

Name and quantity 

Main boom assembly

Main boom bottom section 10.5m

Main boom middle section 3m

Main boom middle section 6m

Main boom middle section 12mA

Main boom middle section 12mB

Main boom transition section 7m

Main boom connection section1.5m

Arm pulley block

H(B)34

1

3[1]

1[0]

0[1]

0

1

1

(1)

H(B)37

1

2[0]

0[1]

1[1]

0

1

1

(1)

H(B)40

1

3[1]

0[1]

1

0

1

1

(1)

H(B)43

1

2[0]

1[0]

1[2]

0

1

1

(1)

H(B)46

1

3[1]

1[0]

1[2]

0

1

1

(1)

H(B)49

1

2[0]

0[1]

2

0

1

1

(1)

H(B)52

1

3[1]

0[1]

2

0

1

1

(1)

H(B)55

1

2[0]

1[0]

2[3]

0

1

1

(1)

H(B)58

1

3[1]

1[0]

2[3]

0

1

1

(1)

H(B)61

1

2[0]

0[1]

3

0

1

1

(1)

H(B)64

1

3[1]

0[1]

3

0

1

1

(1)

H(B)67

1

2[0]

1[0]

3

0[1]

1

1

(1)

H(B)70

1

3[1]

1[0]

3

0[1]

1

1

(1)

H(B)73

1

2[0]

0[1]

3

1

1

1

(1)

H(B)76

1

3[1]

0[1]

3

1

1

1

(1)

*H(B)79

1

2[0]

1[0]

3

1[2]

1

1

(1)

*H(B)82

1

3[1]

1[0]

3

1[2]

1

1

(1)

*H(B)85

1

2[0]

0[1]

3

2

1

1

(1)

 

Notes:

1. “*”--Indicates that the main boom combination needs to use a 1.31m waist rope; (B)--The main boom head pulley block is an option.

2. The rear pull plates of the tower boom need to be removed from each boom section, and the tower boom guide pulley needs to be removed from the main boom reducer section.

3. Two main boom intermediate sections of 3m can be used to replace one main boom intermediate section of 6m, or two main boom intermediate sections of 3m and one main boom intermediate section of 6m can be used to replace one main boom intermediate section of 12mA. When replacing, attention must be paid to the matching of the number of pull plates and pins.

 

B. Fixed jib working conditions Fixed jib section combination table

 

Name and quantity Fixed jib assembly

Fixed jib Bottom section 4.5m

Fixed jib middle section 3m

Fixed jib middle section 6m

Fixed jib top section 2.5m

Fixed jib single pulley(S)

F(S)7

1

0

0

1

(1)

F(S)10

1

1

0

1

(1)

F(S)16

1

1

1

1

(1)

 

Notes:

1.  (S) ---- indicates the optional fixed jib single pulley [the fixed jib single pulley is common to the shield arm single pulley].

2. The fixed jib boom section is common to the shield jib boom section.

3. To ensure that the arm combination function is maximized, it is recommended that users choose to purchase a fixed jib length of 7m.

 

Product Tags: 2nd xcmg 300t crawler crane   2nd xcmg 300 ton crane  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Shandong Tengfei Hoisting Engineering Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)