Used 300t Boom Crawler Crane Inject New Vitality Into Engineering Construction
|
XGC 300t Crawler Crane Technical Specifications
Typical working conditions
1. Main boom working conditions
A.Combination table of main boom sections without arm end pulley
Notes: 1.The “*” main boom combination requires a 1.33m waist rope. 2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the main boom reducer section. 3.Two 3m main boom intermediate sections can be used to replace one 6m main boom intermediate section, or two 6m main boom intermediate sections can be used to replace one 12mA main boom intermediate section, but attention must be paid to the matching of the pull plate and the pin number. 4.To ensure that the boom combination function is maximized, it is recommended to purchase main boom lengths of 70m, 67m, and 64m.
B.Combination table of main boom sections with arm end pulleys
Notes: 1. *” The main boom combination requires a 1.33m waist rope. 2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the main boom reducer. 3.Two main boom intermediate sections of 3m can be used to replace one main boom intermediate section of 6m, and two main boom intermediate sections of 6m can be used to replace one main boom intermediate section of 12mA, but attention must be paid to the matching of the pull plate and the pin number. 4.To ensure the maximum function of the boom combination, it is recommended that users purchase the main boom length of 64m and 70m. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Product Tags: 300t boom crawler crane engineering construction boom crawler crane |
![]() |
XGC xcmg crawler crane 300 ton Shield Boom Auxiliary Hook For Optimal Shield Working Efficiency |
![]() |
Construction Sites XCMG 300t Crawler Crane For Heavy Lifting Tasks |
![]() |
XGC 300t Crawler Crane Xcmg For Large Projects |
![]() |
Used XGC Xcmg 300 Ton Crawler Crane Heavy Equipment |
![]() |
Heavy Used 300t Crawler Crane For Large Bridges |
![]() |
Used XGC 300t Crawler Crane For Installing And Maintaining Power Towers And Substation Equipment |