China Crawler Crane manufacturer
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
1
Home > Products > Mobile Cranes >

Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System

Browse Categories

Shandong Tengfei Hoisting Engineering Co., Ltd.

City: zibo

Province/State:shandong

Country/Region:china

Tel:86-0533-7975775

Contact Person:
Mr.Gong
View Contact Details

Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System

Brand Name XCMG
Model Number XLC260
Place of Origin China
Minimum Order Quantity One Crane
Price Negotiable Price
Payment Terms L/C,T/T
Supply Ability Supply According to Customer Needs
Delivery Time According to Order Confirmation
Packaging Details Packing According to Customer Requirements
Maximum Wind Speed for Operation Up to 20 m/s
Control System Hydraulic
Maximum Lifting Height Up to 120 meters
Engine Power Up to 500 kW
Outrigger Length Up to 10 meters
Maximum Working Radius Up to 80 meters
Travel Speed Up to 80 km/h
Boom Length Up to 100 meters
Counterweight Up to 100 tons
Maximum Gradeability Up to 30%
Detailed Product Description

260T Crawler Crane Plays A Key Role In Power Engineering Installation

XLC260 Crawler Crane Technical Specifications

 

Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m

 

Main boom working condition_Characteristics of boom end pulley auxiliary hook with main boom main hook (HBS/2)

 

Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

 

23

26

29

32

35

38

41

44

47

50

53

7

13.5

13.5

 

 

 

 

 

 

 

 

 

8

13.5

13.5

13.5

13.5

13.5

 

 

 

 

 

 

9

13.5

13.5

13.5

13.5

13.5

13.5

13.5

 

 

 

 

10

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

11

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

12

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

 

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

38

 

 

 

 

 

 

13.5

13.5

13.5

13.5

13.5

40

 

 

 

 

 

 

 

13.5

13.2

13.1

12.9

42

 

 

 

 

 

 

 

 

12

11.8

11.6

44

 

 

 

 

 

 

 

 

10.8

10.6

10.4

46

 

 

 

 

 

 

 

 

8

9.6

9.4

48

 

 

 

 

 

 

 

 

 

 

8.4

Magnification

1

1

1

1

1

1

1

1

1

1

1

 

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

 

Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

 

56

59

62

65

68

71

74

77*

80*

11

13.5

13.5

 

 

 

 

 

 

 

12

13.5

13.5

13.5

13.5

13.5

 

 

 

 

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

 

 

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

38

13.5

13.5

13.5

13.5

13.5

13.5

13.2

13.1

12.9

40

13

12.8

12.6

12.4

12.1

12

11.7

11.7

11.4

42

11.8

11.5

11.3

11.1

10.8

10.7

10.4

10.4

10.1

44

10.6

10.4

10.2

9.9

9.7

9.5

9.3

9.2

9

46

9.6

9.3

9.1

8.9

8.6

8.5

8.2

8.2

7.9

48

8.6

8.4

8.2

7.9

7.7

7.5

7.3

7.2

7

50

7.7

7.5

7.3

7

6.8

6.7

6.4

6.4

6.1

52

6.9

6.7

6.5

6.2

6

5.8

5.6

5.5

5.3

54

 

5.9

5.7

5.5

5.2

5.1

4.8

4.8

4.5

56

 

 

5

4.8

4.5

4.4

4.2

4.1

3.9

58

 

 

 

4.1

3.9

3.8

3.5

3.5

3.2

60

 

 

 

3.5

3.3

3.2

2.9

2.9

2.6

62

 

 

 

 

2.7

2.6

2.3

2.3

2.1

64

 

 

 

 

 

2.1

1.8

1.8

 

Magnification

1

1

1

1

1

1

1

1

1

 

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

Product Tags: construction crawler crane 260t   construction crawler telescopic crane   260t crawler telescopic crane  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Shandong Tengfei Hoisting Engineering Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)