China Crawler Crane manufacturer
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
1
Home > Products > Mobile Cranes >

Suitable 260T Used Crawler Cranes / Mobile Crawler Crane XCMG XLC260

Browse Categories

Shandong Tengfei Hoisting Engineering Co., Ltd.

City: zibo

Province/State:shandong

Country/Region:china

Tel:86-0533-7975775

Contact Person:
Mr.Gong
View Contact Details

Suitable 260T Used Crawler Cranes / Mobile Crawler Crane XCMG XLC260

Brand Name XCMG
Model Number XLC260
Place of Origin China
Minimum Order Quantity One Crane
Price Negotiable Price
Payment Terms L/C,T/T
Supply Ability Supply According to Customer Needs
Delivery Time According to Order Confirmation
Packaging Details Packing According to Customer Requirements
Travel Speed 80 kilometers per hour
Type Hydraulic
Fuel Type Diesel
Operating Weight 50,000 kg
Outrigger Type Hydraulic telescopic
Boom Length 30 meters
Safety Features Load moment limiter, anti-two block system
Lifting Speed 10 meters per minute
Capacity 260tons
Maximum Tip Height 50 meters
Detailed Product Description

Suitable Used 260T Crawler Cranes Are Available For Purchase

XLC260 Crawler Crane Technical Specifications

 

Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m

 

Main boom working condition_main boom main hook characteristics without arm end pulley (HB/1)

 

Main boom working condition_No arm end pulley HB/1_75t+30t main boom main hook performance

 

Operating radius(m)

Main boom length(m)

 

23

26

29

32

35

38

41

44

47

50

53

5.5

244.6

 

 

 

 

 

 

 

 

 

 

6

219.4

219.4

215.9

 

 

 

 

 

 

 

 

7

181.5

181.5

181.4

181.4

181.3

172.9

 

 

 

 

 

8

154.5

154.6

154.4

154.4

154.2

154.1

150.3

145.9

 

 

 

9

134.3

134.3

134.2

134.2

134

133.9

132

128.5

125.1

121.9

118.8

10

118.6

118.6

118.4

118.5

118.3

118.1

117.4

114.6

111.8

109.1

106.6

11

106

106

105.9

105.9

105.7

105.6

105.3

103.2

100.9

98.6

96.5

12

95.8

95.8

95.6

95.6

95.4

95.3

95

93.8

91.8

89.9

88

13

87.2

87.2

87

87.1

86.8

86.7

86.4

85.9

84.1

82.4

80.8

14

80.2

80.2

80

80.1

79.8

79.7

79.4

79.1

77.5

76

74.5

15

73.5

73.6

73.6

73.7

73.6

73.5

73.4

73.2

71.8

70.5

69.1

16

67.1

67.2

67.2

67.3

67.2

67.1

66.9

66.9

66.7

65.6

64.4

17

61.6

61.8

61.7

61.8

61.7

61.6

61.4

61.4

61.2

61

60.2

18

56.9

57

57

57.1

56.9

56.8

56.7

56.6

56.4

56.3

56.1

19

52.7

52.9

52.8

52.9

52.8

52.7

52.5

52.5

52.3

52.1

51.9

20

49.1

49.3

49.2

49.3

49.2

49.1

48.9

48.8

48.6

48.5

48.3

22

 

43.1

43.1

43.2

43.1

43

42.8

42.7

42.5

42.4

42.2

24

 

38.2

38.2

38.3

38.1

38.1

37.9

37.8

37.6

37.4

37.2

26

 

 

34.1

34.2

34.1

34

33.8

33.7

33.5

33.4

33.1

28

 

 

 

30.8

30.7

30.6

30.4

30.3

30.1

30

29.7

30

 

 

 

 

27.8

27.7

27.5

27.5

27.2

27.1

26.8

32

 

 

 

 

25.2

25.2

25

25

24.7

24.6

24.3

34

 

 

 

 

 

23

22.8

22.8

22.6

22.4

22.2

36

 

 

 

 

 

 

20.9

20.9

20.7

20.5

20.2

38

 

 

 

 

 

 

 

19.2

19

18.8

18.6

40

 

 

 

 

 

 

 

17.6

17.4

17.3

17

42

 

 

 

 

 

 

 

 

16.1

15.9

15.7

44

 

 

 

 

 

 

 

 

 

14.7

14.5

46

 

 

 

 

 

 

 

 

 

 

13.3

Magnification

24

22

20

18

16

15

14

13

12

11

10

Notes:

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

 

Main boom working condition_No arm end pulley HB/1_75t+30t main boom main hook performance

 

Operating radius(m)

Main boom length(m)

 

56

59

62

65

68

71

74

77*

80*

83*

86*

10

104.4

102

98.4

 

 

 

 

 

 

 

 

11

94.7

92.6

90.6

88

78.8

71

 

 

 

 

 

12

86.5

84.7

83

81.3

77.6

69.8

62.8

61.2

56

 

 

13

79.5

77.9

76.4

74.9

73.4

68.7

61.8

60.4

55.3

50.8

46.6

14

73.5

72.1

70.7

69.3

68

66.8

60.7

59.5

54.6

50.1

46

15

68.2

66.9

65.7

645

63.2

62.2

59.7

58.7

53.8

49.4

45.4

16

63.6

62.4

61.3

60.2

59

58.1

57

56.1

53.1

48.9

44.8

17

59.5

58.4

57.4

56.3

55.3

54.4

53.3

52.6

51.6

48.1

44.2

18

55.8

54.8

53.9

52.9

51.9

51.1

50.1

49.4

48.5

47.5

43.6

19

52.1

51.6

50.7

49.8

48.9

48.1

47.2

46.6

45.7

44.9

43

20

48.5

48.3

47.8

47

46.1

45.4

44.6

44

43.1

42.4

41.6

22

42.3

42.1

41.9

41.7

41.3

40.7

39.9

39.4

38.7

38

37.3

24

37.4

37.2

37

36.7

36.5

36.4

36

35.5

34.9

34.3

33.6

26

33.3

33.1

32.9

32.7

32.4

32.3

32

32

31.6

31.1

30.4

28

29.9

29.7

29.5

29.2

29

28.9

28.6

28.6

28.3

28.2

27.7

30

27

26.8

26.6

26.3

26.1

25.9

25.7

25.6

25.4

25.2

25

32

24.5

24.3

24.1

23.8

23.6

23.4

23.2

23.1

22.9

22.7

22.4

34

22.3

22.1

21.9

21.6

21.4

21.3

21

21

20.7

20.5

20.3

36

20.4

20.2

20

19.7

19.5

19.3

19.1

19

18.8

18.6

18.3

38

18.7

18.5

18.3

18

17.8

17.6

17.4

17.3

17.1

16.9

16.6

40

17.2

17

16.8

16.5

16.3

16.1

15.9

15.8

15.6

15.4

15.1

42

15.9

15.6

15.4

15.2

14.9

14.8

14.5

14.5

14.2

14

13.8

44

14.7

14.4

14.2

14

13.7

13.6

13.3

13.2

13

12.8

12.5

46

13.6

13.3

13.1

12.8

12.6

12.4

12.2

12.1

11.9

11.7

11.4

48

12.5

12.3

12.1

11.8

11.6

11.4

11.2

11.1

10.9

10.7

10.4

50

11.6

11.4

11.2

10.9

10.6

10.5

10.2

10.2

9.9

9.8

9.5

52

 

10.5

10.3

10

9.8

9.7

9.4

9.4

9.1

8.9

8.6

54

 

 

9.5

9.3

9

8.9

8.6

8.6

8.3

8.1

7.9

56

 

 

 

8.5

8.3

8.1

7.9

7.8

7.6

7.4

7.1

58

 

 

 

7.8

7.6

7.5

7.2

7.2

6.9

6.7

6.5

60

 

 

 

 

7

6.8

6.6

6.5

6.3

6.1

5.8

62

 

 

 

 

 

6.2

6

5.9

5.7

5.5

5.2

64

 

 

 

 

 

 

5.4

5.4

5.1

5

4.7

66

 

 

 

 

 

 

4.9

4.9

4.6

4.5

4.2

68

 

 

 

 

 

 

 

4.4

4.1

4

3.7

70

 

 

 

 

 

 

 

 

3.7

3.5

3.2

72

 

 

 

 

 

 

 

 

 

3.1

2.8

74

 

 

 

 

 

 

 

 

 

 

2.4

76

 

 

 

 

 

 

 

 

 

 

2

Magnification

9

9

8

7

7

6

5

5

5

4

4

         Notes:

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

Product Tags: 260t used crawler cranes   crawler crane xcmg xlc260   260t crawler crane xcmg  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Shandong Tengfei Hoisting Engineering Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)