China Electric Overhead Crane manufacturer
Hefei Kiwi Heavy Machinery Co., Ltd.
Hefei Kiwi Heavy Machinery Co., Ltd.
1
Home > Products > Single Girder Overhead Crane >

4Ton Electris Single Girder Overhead Crane Applies To Construction Site Lifter , Warehouse

Browse Categories

Hefei Kiwi Heavy Machinery Co., Ltd.

City: hefei

Province/State:anhui

Country/Region:china

Tel:86-551-67753801

Contact Person:
Mr.Chen
View Contact Details

4Ton Electris Single Girder Overhead Crane Applies To Construction Site Lifter , Warehouse

Brand Name kiwicrane
Model Number LD
Certification ISO、CE
Place of Origin China
Minimum Order Quantity one set
Price USD3000~50000 one set
Payment Terms MoneyGram, Western Union, T/T, D/P, D/A
Supply Ability 1000 Sets One Year
Delivery Time 20 Working Days
Packaging Details PALLET
Condition New
Warranty 1 Year
Span 7.5-31.5m As Your Request
Feature Bridge Crane
Lifting Height 6m~30m
Lifting Load 4 Ton
Product Name Electric Single Girder Overhead Crane
Control Method Pendant Controller/Radio Remote Control
Color Yellow
Lifting Mechanism Eliectric Wire Rope Hoist Or Electric Chain Hoist
Application Construction Site Lifter,warehouse And So On,Single Girder Crane Use
Power Source 3 Phase 380V 50hz,50/60Hz
Working Duty A3~A5
Detailed Product Description

4Ton Electris Single girder overhead crane applies to Construction Site Lifter,warehouse

 

FeatureEuropean-Style A5 Crane
Duty ClassificationA5 (Heavy Duty/Intensive Use) – Designed for frequent, high-intensity operations.
Structural DesignLighter yet stronger due to optimized steel structures and precision welding.
Hoisting MechanismHigh-performance hoist (e.g., modular design) with faster speeds and longer service life.
End CarriagesCompact, low-headroom design with 42CrMo wheels for smoother travel.
Control SystemAdvanced frequency control (VF drive) for precise, jerk-free movement.
MaintenanceReduced maintenance due to premium
LifespanComponents; longer lifespan even in demanding conditions.
CostHigher initial investment but lower total cost of ownership (TCO)

 

1. Low requirements for plant space:
 
The single-beam structure makes the overall height of the crane (H size) relatively small, effectively utilizing the plant space, especially suitable for workshops with limited clearance height.
 
The track is usually installed on the bracket of the plant frame or column, and does not occupy the ground space.
 
 
2. Driving mode:
 
Trolley operation: Usually driven at both ends (i.e., each driving wheel on both sides has a set of motor + reducer + brake) or centralized drive (a set of drive devices drives the wheels on both sides through a long drive shaft).
 
Trolley operation (i.e., electric hoist operation): driven by the trolley operation motor of the electric hoist.
 
3.Simple operation and flexible operation:
 
Mainly rely on the electric hoist (usually a wire rope electric hoist) suspended under the main beam for vertical lifting operations.
 
The entire crane (trolley) can run longitudinally along the tracks on both sides of the plant.
 
The electric hoist (trolley) can run horizontally along the track on the lower flange of the main beam.
 
Usually equipped with ground handle operation or wireless remote control operation, the operator can flexibly follow and control on the ground, with good vision, simple and intuitive operation.
 
Product Tags: Construction Site Lifter girder overhead crane   4 Ton Single Girder Overhead Crane  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Hefei Kiwi Heavy Machinery Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)