Solar Mounting Ground Anchor Helical Piles For Foundations Screw
Pile
Basic info.
color | Silver | material | Steel |
brand name | KXD | place of origin | China |
Product name | Solar Ground Screw Pile Anchor Galvanized with Flange | Surface treatment | Hot Dipped Zinc Coating |
Application | Solar Ground Mounting System | Packing | In steel pallet |
Product Descriptions
A helical anchor also is known as a helix anchor, screw anchor, or
helical pile is extendable base equipment which is made up of
helical engineered metallic plates that are attached to a central
steel shaft using a round or rectangular cross-section. The steel
plate thickness, diameter, number, and helices operate are
determined through the restricted or supported arrangement’s
minimal design life, the ecological rust, and geotechnical
parameters, along with the design fill demands.
Helical anchor system may be used to reestablish new foundations or
restore present ones. Helical foundation anchors are used for
lighthouses, roads, railroads, telecommunication, and in a lot of
different businesses that need rapid installation or structure near
to present constructions. Evidence, maintaining structures, other
common places make use of because they are appropriate for
compression in addition to tensile loads.
Advantages
Helical anchors have presented many solutions for different types
of projects. This
section will summarize the advantages of their use.
1.They produce small or no vibration during installation,
decreasing possible
damage to the structures from soil movement.
2.They can be installed in any weather conditions and may be loaded
immediately
after installation; there is no cure time as with
concrete foundations.
3.Easy installation; there is no need for excavation and they can
be installed in
limited access areas.
4.They are quick to install and there is no need of big equipment
in comparison
with other types of deep foundation
construction.
5.They can be installed in soft surface and high water table
conditions.
Prediction of capacity is found after installation
from torque to capacity
relationship, useful to verify theoretical
capacity.
6.Installation produces no spoils to remove or remediate.
Manufacturing Process