High Rise Long Span Steel Structure Gymnasium Prefabricated Customized
|
High Rise Long Span Steel Structure Gymnasium Prefabricated Customized
The steel structure gymnasium uses steel as the main structural material, like H-shaped steel to build a stable load-bearing frame, which can easily support a large-span space and meet the needs of the gymnasium for open fields. Lightweight materials such as color steel plates are commonly used on roofs and walls, which have both thermal insulation and waterproof properties, while reducing the weight of the building. It was built quickly, which shortened the construction period and allowed the venue to be put into use as soon as possible. Moreover, the high toughness and high strength of the steel structure give the stadium good seismic performance, which can ensure the safety and stability of the stadium in various complex environments, and provide a reliable venue for sports events and activities.
Product Advantages: Stable structure and flexible space: The load-bearing frame built by steel as the main structural material and H-shaped steel has high strength and good toughness, can withstand huge loads, support a large span space, and meet the needs of the gymnasium for various large-scale sports events, theatrical performances and other activities. There are almost no excessive load-bearing columns in the interior, and the layout of the spectator seats and competition venues is flexible, which can be diversified according to the needs of different activities.
What we can offer you Design services: We have experienced structural engineers and architectural designers, and use advanced design software to design the steel structure of the gymnasium. It not only ensures the safety of the structure and meets the needs of the super-large span space, but also pays attention to the coordination between the appearance of the building and the surrounding environment, taking into account the aesthetics and uniqueness. At the same time, taking into account the flexible layout of functional areas such as internal auditorium seats and competition venues, personalized design solutions are provided.
Company Profile Packing: we pack all the parts on the steel pallet and push into
the container when clients received they can pulling them out
within half an hour. It can help our clients to save a lot of time
and labor cost during unloading.
Packaging & Shipping 1. All standard components are packed in plywood box.
Certifications If there is any qualty problem, the Buyer shall make a claim within 50 days upon arrival of the goods at the destination port. In case of any shortage in quantity, the Buyer shall make a claim within 10days upon arival of the goods at the destination port. In any case the claim must be accompanied by an inspection report from a reputable public surveyor agreed upon by the Seller. lf it is found that the main responsibility under the contract to the Seller, the Seller shall reply to the claim within 20 days upon receipt of the claim, together with the proposed solution, to the Buyer.
FAQ
|
||||||||||||||
Product Tags: High Rise Steel Structure Gymnasium Long Span Steel Structure Gymnasium Prefabricated Steel Gymnasium Building |
![]() |
Large Span Galvanized Steel Structure Building Hot Rolled For Stadium Football Field |
![]() |
Customized Steel Structure Stadium Large Scale Metal Gym Buildings Fire Resistant |
![]() |
Prefabricated Steel Structure Gymnasium Building Fast Install |
![]() |
Q235 Q355 Steel Gymnasium Building Large Span For Basketball Hall |
![]() |
Prefab Steel Structure Gymnasium Building Easy Install For Sport Hall |
![]() |
Bolt Connection Steel Structure Gymnasium Prefab Metal Gymnasium Buildings |