Large Span Galvanized Steel Structure Building Hot Rolled For Stadium Football Field
|
Large Span Galvanized Steel Structure Building Hot Rolled For Stadium Football Field
The steel structure stadium is based on high-strength steel, and through the exquisite design of truss, grid or suspension structure, it realizes a 100-meter-level super-large span and a magnificent spatial scale, easily covering tens of thousands of spectators and multi-functional activity areas. The standardized steel components prefabricated in the factory have strict precision, and are accurately assembled on site, which greatly shortens the construction period; With the characteristics of light weight and high strength, steel not only reduces the weight of the building, but also shows excellent earthquake and wind resistance, and can withstand extreme weather tests. The surface anti-corrosion and fireproof treatment process prolongs the service life of the structure and ensures the safety of the event.
Product Advantages: In terms of construction, the steel structure stadium adopts the industrialized prefabrication mode, and the steel beams, steel columns and other components are cut by CNC machine tools in the factory, automatically welded and formed, and the accuracy is controlled at the millimeter level, and the site is quickly connected by bolts, and the construction period is shortened by more than 50% compared with the traditional concrete structure. This prefabricated construction method greatly reduces on-site wet operations, reduces noise and dust pollution, and is not affected by bad weather, ensuring the efficient progress of the project and meeting the emergency construction needs of large-scale event venues.
The advantages of the steel structure stadium are significant, in terms of space shaping, high-strength steel can achieve a super span of more than 200 meters through innovative structural systems such as trusses, grids, and cable membranes, easily covering tens of thousands of spectators and competition venues, and the internal column-free design brings a wide field of vision, whether it is a track and field event, a football match, or a large-scale theatrical performance, it can provide an excellent viewing experience. At the same time, the vertical direction can flexibly expand the multi-storey audience stands and commercial supporting space, make full use of land resources, and improve the comprehensive utilization rate of the venue.
In terms of structural safety and durability, the yield strength of steel exceeds 345MPa, and with scientific mechanical calculations and structural optimization, the stadium is endowed with excellent seismic and wind resistance, and can withstand the impact of 12-level strong winds and earthquake disasters. The surface is treated with multiple anti-corrosion treatments such as hot-dip galvanizing, combined with professional fireproof spraying, so that the steel structure is still stable and durable in long-term outdoor environments, with a service life of more than 50 years, effectively reducing maintenance costs.
What we can offer you
Design services: We have experienced structural engineers and architectural designers, and use advanced design software to design the steel structure of the gymnasium. It not only ensures the safety of the structure and meets the needs of the super-large span space, but also pays attention to the coordination between the appearance of the building and the surrounding environment, taking into account the aesthetics and uniqueness. At the same time, taking into account the flexible layout of functional areas such as internal auditorium seats and competition venues, personalized design solutions are provided.
Company Profile Packing: we pack all the parts on the steel pallet and push into
the container when clients received they can pulling them out
within half an hour. It can help our clients to save a lot of time
and labor cost during unloading.
Packaging & Shipping 1. All standard components are packed in plywood box.
Certifications If there is any qualty problem, the Buyer shall make a claim within 50 days upon arrival of the goods at the destination port. In case of any shortage in quantity, the Buyer shall make a claim within 10days upon arival of the goods at the destination port. In any case the claim must be accompanied by an inspection report from a reputable public surveyor agreed upon by the Seller. lf it is found that the main responsibility under the contract to the Seller, the Seller shall reply to the claim within 20 days upon receipt of the claim, together with the proposed solution, to the Buyer. FAQ
|
||||||||||||||
Product Tags: Stadium Steel Structure Building Hot Rolled Steel Structure Stadium Football Field Galvanized Steel Structure |
![]() |
Large Span Galvanized Steel Structure Building Hot Rolled For Stadium Football Field |
![]() |
Customized Steel Structure Stadium Large Scale Metal Gym Buildings Fire Resistant |
![]() |
Prefabricated Steel Structure Gymnasium Building Fast Install |
![]() |
Q235 Q355 Steel Gymnasium Building Large Span For Basketball Hall |
![]() |
Prefab Steel Structure Gymnasium Building Easy Install For Sport Hall |
![]() |
Bolt Connection Steel Structure Gymnasium Prefab Metal Gymnasium Buildings |