411 - 420 of 1272 Selling leads
3 Vacuum Chambers Helium Leak Detection Equipment For Relay 30s/2PCS Equipment Overview Purpose of use: Helium inspection of relay products Helium ...
2024-12-09 17:38:04
|
Helium Recovery Machine Helium Recovery Rate ≥99% Energy Consumption 15KW Equipment Overview Device Functions and Principles Introduction Equipment ...
2024-12-09 17:38:04
|
IEC60065 Test Pin For Information Technology Equipment Pin Length 15mm Handle Length 20mm IEC60065 clause 9.1.1 For CLASS II constructions, the test ...
2024-12-09 17:38:04
|
IEC60335-1 Hot Winding Resistance Meter, Total Power Consumption<15W, 2 Channels Standard:Conforms to IEC 60065 clause 7.1, IEC60950, IEC60335-1 ...
2024-12-09 17:37:47
|
IEC 60884-1 Plug Socket Tester Load Box Load Cabinet 3 Stations Standard: IEC 60884-1 2013 clause 20 and 21, IEC 60950-1, IEC 60598-1, IEC61058-1, ...
2024-12-09 17:37:32
|
UL746A Clause 34 Glow-Wire Ignitability Tester To Determine The Relative Ignitability 34 Glow-Wire Ignitability Test 34.1 General 34.1 .1 The test ...
2024-12-09 17:30:39
|
IEC60884-1 Plug Socket Tester Temperature Rising Tester 0-125A Testing Current For this test, the temperature rise is measured on the terminals. The ...
2024-12-09 17:30:39
|
IEC60669-1 Clause 19.3 Self Ballasted Lamp Load Box, Power Meter Range 0-9KW After these tests, it shall also be possible to make and break the switch ...
2024-12-09 17:30:39
|
IEC60884-1 Apparatus For Verification of Maximum And Minimum Force Equipped With Test Plugs 22 Force necessary to withdraw the plug The construction ...
2024-12-09 17:30:39
|
IEC60335-1 Clause 14 High Voltage Impulse Generator, Voltage Waveform Peak 0.2~12.5kV The high voltage impulse generator generates high voltage ...
2024-12-09 17:30:39
|