Specifications: Product Name | - Q235 Substation Transformer Frame Steel Structure for Electric
Distribution Line
| Application | - Electrical Power Transformer Substation / Switch Yard
| Voltage Grade | - 10~500KV (10KV, 13.8KV,33KV, 35KV, 66KV, 110KV,132KV, 220KV, 230KV,
330KV, 500KV or Others )
| Wall thickness | | Once Forming | - 16m Once forming without joint
| Welding | - Welding complies with AWS D1.1 standard.
- CO2 welding or submerged arc auto methods
- No fissure, scar, overlap, layer or other defects
- Internal and external welding makes the pole more beautiful in
shape
- If customers need any other requirements of welding, we also can
make adjustment ad your request
| Joint | - Joint with insert mode, flange mode.
| Galvanization | - Hot dip galvanization in accordance with Chinese standard GB/T
13912-2002 and American standard ASTM A123.
| Export Experiences | - Philippines , Malaysia , Pakistan , Russia , UK
, Australia , Ghana , Angola , Tanzania
, Slovakia , New Zealand , Sierra Leone ,
Bangladesh , Maxico , Nigeria , Republic of the
Congo , etc,
|
Product Advantages: - Short Construction Cycle
- Low Overall Cost
- Easy Installation and Maintenance
- Weather Resistance
- Anti-corrosion
- More than 17 years Design & Manufacture Experience
- Capable to Handle Volume Orders
- Provide Professional Design by Our Experienced R&D Engineers
- Rich Exporting Experience
- ODM, OEM Acceptable
- Technical Support by E-mail
Description: The electrical substation steel structure is the main load
supporting structures of substation, so its quality has direct
relation with the safety and reliability of power grid operation. we have a whole set of quality test equipment to determine
the physical properties and sizes of all steel structures, ensuring
the desirable quality of the whole electrical substation
structures. The electrical substation steel structure has many
advantages: 1. Short Construction Cycle 2.Low Overall Cost
3. Easy Installation and Maintenance
4. Weather Resistance 5. Anti-corrosion
6. More than 17 years Design & Manufacture
Experience 7. Capable to Handle Volume Orders Installation Site
Terms and Conditions 1. Price Term: EXW, FOB, CFR or CIF.
- Shipping seaport: Shanghai Seaport.
- Please provide drawings if you have so that we can calculate
the accurate price for you.
- We also provide design according to your requests, if you
don't have drawings.
2. MOQ: One 40FT Container. 3. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight
before shipment. Other payment way can be negotiated. 4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed. 5. Package: Normally wrapped by plastic bags or burlap cloth at the top
and bottom, or according to clients requirement. Our Services - Reply within 24 Working Hours
- Factory Direct Sale
- More than 15 Years Design & Manufacture Experience
- Capable to Handle Volume Orders
- High-Quality and Low-Price Products
- Provide Professional Design by Our Experienced R&D
Engineers
- Rich Exporting Experience
- ODM, OEM Acceptable
- Technical Support by E-mail
- Calling service
10-750KV Hot Dip Galvanized Electrical Power Substation Steel
Structures for Power Transformer Substation.pdf
|