Heavy Loading Capacity Modular Steel Bailey Bridge Great Stability Long Fatigue Life
|
Heavy Loading Capacity Modular Steel Bailey Bridge Great Stability Long Fatigue LifeDescription The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance.
The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.
Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
Specification
Three normal width bridges are as following:
Application 1. Standard Single Lane: Bridge deck width: 3.15m; Span length:
9.14-60.96m
Features and Benefits Modern versions of classic “Bailey Bridge” design
Advantage 1.High strength and big stiffness, relative to the concrete bridge
can be reduced trabecular high and self-respect
Installation It is easy to mounting Bailey bridges without any help of cranes or
hoists. One bridge installation can be finished only by hands of
human power, using complete launching tools including roller, flat
roller, roller frame, wrench and jack.
Our company Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.
Proper project coordination and efficient delivery of the structural steel to your bridge project is a key factor in its ultimate success. This is what gives us the leading edge.
From material purchase and tracing, planning compilation, drawing detailing, production arrangement, quality inspection, to on-going painting, packing and delivering, we have separated department to strictly control process, quality and traceability, so that the perfect Bailey/Belay/Baley Bridge can be made.
Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence. Warmly welcome all friends and clients from International market to visit us! |
||||||||||||||||
Product Tags: prefabricated bridges structural steel bridge |
![]() |
200 Type Double Lane Steel Bailey Bridge 50 Tons Load Capacity Galvanized Construction |
![]() |
10 Sets Steel Bailey Bridge Prefabricated Galvanized 200# TSR Q345B |
![]() |
Prefabricated Steel Pedestrian Bailey Bridge Heavy Loading Capacity |
![]() |
Galvanized Modular Prefabricated Steel Bailey Bridge Temporary Emergency Mabey Panel |
![]() |
Metal Building Steel Pedestrian Bridge Painted Bailey Panel Prefabricated |
![]() |
Temporary Steel Bridge Railway Structure Of Stay Cable |