Dairy Production Line Industrial Yogurt Making Machine With Bottle Package
|
Smart integrated dairy production line for standardized milk, yoghurt processing with bottle package
Company introduction: Shanghai Beyond Machinery Co., Ltd, established in the year of 2005, is a manufacture specialized technology-oriented machinery. BEYOND is able to provide the turn-key projects, including the design, manufacture, installation and commissioning for the production lines of liquid food such as dairy, drink, ice cream, fruit and vegetable, bio-engineering, chemical and pharmaceutical. Cooperated with several domestic and abroad Light Industrial or scientific research institutions, we absorb their advanced technology and then take base to develop new even better process techniques, we are now specializing in all kind of sanitary stainless steel tanks, heater, cooler, sterilizer, concentrator, pump and other pipe and fittings.
Through the years of the common efforts of our staff, we have obtained high share in the market of machinery industry, and have developed ourselves into a medium-sized enterprise of certain popularity in the industry. Combining scientific research, technical development, production, marketing and after-sale service, we keep ourselves acting strictly in accordance with the quality assurance system of ISO 9001, to ensure us to provide the good quality equipments that are in accordance with the relative standards of Juice, Dairy, Pharmacy, bio-chemical, such as HACCP, QS and GMP etc.
Thank you very much for the trust of all our customers and we expect to build up good business cooperation friendship with more and more clients, and warmly welcome to your visiting to our factory!
DESCRIPTION Special design for small scale yogurt production line, install who
plant equipment on a skid frame work.
Figure 11.14 shows the processing of stirred yogurt. The pretreated
milk, cooled to incubation temperature, is pumped to the incubation
tanks (7). Simultaneously a preset volume of bulk starter (6) is
dosed into the milk stream. After a tank has been filled, agitation
commences and continues for a short time to assure uniform
distribution of the starter culture. The incubation tanks are
insulated to ensure that the temperature remains constant during
the incubation period. The tanks can be fitted with pH meters to
check the development of acidity. In typical production of stirred
yoghurt the incubation period is 2.5 to 3hours at 42 – 43C when the
ordinary type of bulk starter (2.5 – 3% inoculums) is utilised. To
attain optimum quality, cooling from 42 – 43C to15 – 22C should be
accomplished within 30 minutes after the ideal pH-value has been
reached to stop further development of bacteria. The coagulum must
be subjected to gentle mechanical treatment so that the final
product will have the correct consistency. Cooling takes place in a
plate heat exchanger (8) with special plate. After cooling to 15 –
22C, the yoghurt is ready for packing. Fruit and various flavours
can be added (10) to the yoghurt when it is transferred from the
buffer tanks to the filling machines. This is done continuously
with a variable speed metering pump which feeds the ingredients
into the yoghurt in the fruit blending unit. The blending unit is
static and hygienically designed to guarantee that the fruit is
thoroughly mixed into the yoghurt. The fruit metering pump and the
yoghurt feed pump operate synchronously.
Euipment list for Soya Milk, Yogurt, Flavored Milk And Juice Production Line
*Delivery time: 120 days after receive TT deposit or formal 100% L/C, upon approval on technical drawings and specifications by client.
*Duration of Guarantee:
1. within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.
2. After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.
3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and subsidary for each worker per day. And the local traffic, accommodation and lodging fees should also be available.
*Installation terms: 1. 50-60 days for installation and commissioning.
2. BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Product Tags: yogurt production equipment yogurt processing plant |
![]() |
4000T/HGoat Camel Milk Production Line Full Auto Valve System |
![]() |
Skid Frame SUS304 Dairy Industrial Yogurt Making Machine small scale |
![]() |
SGS Sanitary 1000L/H Yoghurt Processing Line With Auto CIP Cleaning |
![]() |
Full Automatic Industrial Yogurt Making Machine For Dairy Plant Project 2000L - 20000LPH |
![]() |
Industrial Yogurt Making Machine With Cup Filling 150 - 600kw Power Consumption |
![]() |
Large Scale Yogurt Manufacturing Equipment / Industrial Yogurt Machine ISO 9001 |