China Automation DCS manufacturer
MOORE AUTOMATION LIMITED
MOORE AUTOMATION LIMITED COVID-19 - Moore Automationare still working and able to shipping worldwide Best Price , Fast Shipping , New Products , Good Reputation !
9
Home > Products > ABB Module >

SRFC4510C ABB POWER FILTER UNIT

Browse Categories

MOORE AUTOMATION LIMITED

City: xiamen

Province/State:fujian

Country/Region:china

Tel:86-180-20776792

Contact Person:
Miss.Miya
View Contact Details

SRFC4510C ABB POWER FILTER UNIT

Brand Name ABB
Model Number SRFC4510C
Certification CO.CQ
Place of Origin Sweden
Minimum Order Quantity 1
Price inquiry
Payment Terms T/T
Supply Ability 10 pieces a day
Delivery Time today
Packaging Details new and original with factory sealed
Manufacture Year 2020
Con 6DS1311-8AEtrol System SRFC4510C
Application Nuclear Power Plant
lead time in stock
description ABB
Weight 4lbs
Detailed Product Description

 

SRFC4510C ABB POWER FILTER UNIT

 

⇒ Click here for good price SRFC4510C

Brand/Manufacturer  ABB/SWEDEN
Part Number

  SRFC4510C

Alternate Part Number  SRFC4510C
Description  POWER FILTER UNIT
Dimennsions

  7.2x25x14.4cm  

Weight  1.25kg

 

Contact Us

Email: miya@mvme.cn (CLICK)

QQ: 2851195450

Tel: 86-18020776792(CLICK)

Skype:miyazheng520(CLICK)

 

MOORE NEWS

The sintering method and the Bayer process are currently the main methods for industrial production of alumina.

Most of the alumina produced is produced by Bayer process.

The Bayer-sintering hybrid method was first created, which greatly improved the total recovery of alumina.

With the continuous improvement of production technology, some new production methods such as lime Bayer method and beneficiation Bayer method are continuously applied to production.

 

The integrated process control system is a distributed control system.

The system consists of eight process control subsystems (workshop) for raw material grinding, lime digestion, dissolution, sedimentation, seed filtration, evaporation, product filtration, and roasting.

Each workshop has an engineering station EWS and 2-3 operator stations OPS.

The data collection, real-time monitoring, data processing and other information transmission of the internal process parameters of the workshop are realized by the EtherNet/IP control network.

The main production operations of the entire alumina plant are completed by these eight subsystems, each controlled by a ControlLogix controller.

 

The information layer of the integrated process control system uses EtherNet/IP Industrial Ethernet.

Transfer the information of the above eight workshops to the whole plant production information dispatching center via Ethernet.

The center has two servers SERVER1, SERVER2 and two operating stations OPS1, OPS2, using the factory machine SE Factory.

 

Our advantages

1) TRICONEX(3008,3625,3805E.3721,3700A 4351B...)
2) BENTLY NEVADA(3500/42M ,3500/22M,3500/95.3500/05...)
3) HIMA(F3330,F3236 ,F6217,F7126,F8621A....)
4) FOXBORO(FBM203,FBM204,FBM217,FMB231...)
5) Allan-Bradley (1756,1785,1771,1746,1769..)
6) ABB (DSQC .....)
7) GE(IC693,IC697,IC695,IS200,DS200)
8) BACHMANN(CM202,DI232,MPC240,NT255,AIO288...)
9) ICS (T8403,T8431...)

 

More Products 

SIEMENS6ES7315-2AH14-0AB0SIEMENS6DD1642-0BC0
SIEMENS6ES7331-7PF01-0AB0SIEMENS6ES7322-8BF00-0AB0
SIEMENS6DR5010-0EG00-0AA0SIEMENS6ES7313-6CG04-0AB0
SIEMENS6ES7132-4BD02-0AA0SIEMENS6SE6430-2UD31-1CA0
SIEMENS6ES7138-4CA00-0AA0SIEMENS6SE6420-2UD25-5CA1
SIEMENS6ES7090-0XX84-0KA0SIEMENS6ES7972-0BB42-0XA0
SIEMENS6DD1606-0AD1SIEMENS6SE6420-2UD24-0BA1
SIEMENS6ES7272-0AA30-0YA0SIEMENS6FX8002-2EQ20-1BA0
SIEMENS6SL3330-1TE41-2AA3SIEMENSRMS-TSG-TZ-C
SIEMENS6AV6 545-0BB15-2AX0SIEMENS6ES7223-1PL22-0XA0

Related Products
Email to this supplier
 
From:
Enter your Email please.
To: MOORE AUTOMATION LIMITED
Subject:
Message:
Characters Remaining: (80/3000)