China Superheater Coil manufacturer
Zhangjiagang HuaDong Boiler Co., Ltd.
Zhangjiagang HuaDong Boiler Co., Ltd.
10
Home > Products > Boiler Manifold Headers >

High Efficiency Boiler Headers And Manifolds Coal Fired ASME Standard

Browse Categories

Zhangjiagang HuaDong Boiler Co., Ltd.

Province/State:jiangsu

Country/Region:china

Tel:86-512-58666196

Contact Person:
Miss.Sandy Chen
View Contact Details

High Efficiency Boiler Headers And Manifolds Coal Fired ASME Standard

Brand Name HDB
Model Number Boiler Manifold Header
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Jiangsu , China
Minimum Order Quantity 1 Set
Price Negotiable
Payment Terms L/C, T/T
Supply Ability 800tons/month
Delivery Time 30 working days
Packaging Details Seaworthy Packing
Condition New
Working Temperature 445 Degree
Type Ultra Super Critical
Material 15CrMoG / 12Cr1MoVG
OEM Yes
Color Customized
Detailed Product Description
 
 
High Efficiency Boiler Headers And Manifolds , Coal Fired ASME Standard
 
Product Description
 
The headers of boilers include water-cooling hinders of boilers proper, economizer hinders, superheater hinders, etc. They function for gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.
 

Headers collect and distribute steam or water from or to a series of smaller pipes or conduits. They are made of carbon or ferritic steel, generally of the same grade as the piping systems. Unlike piping systems which are usually butt welded and bent, headers are straight.

The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.

 

1Headers form an important part of all types of boilers.
2Steam from the generating tubes is collected in headers which are therefore always under pressure.
3This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

 

Details

 

1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.

 

2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Features

 

The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
Technical parameters of customer design boiler pressure parts header for CFB boiler.

 

 

Classification

 
MaterialCarbon steel,Alloy steel,Stainless steel.
LengthAccording to costumes requirements.
Temperature Range300℃~1500℃
Diameter(OD)76mm~914mm

 

Application

CFB  distributing economizer header with high welding technique have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

 

Factory Workshop


 

 

Product Tags: boiler header manifolds   headers and manifolds  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Zhangjiagang HuaDong Boiler Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)