China Prefabricated Steel Structures manufacturer
Shenyang iBeehive Technology Co., LTD.
Shenyang iBeehive Technology Co., LTD. Steel Structure Professional Manufacturer with 23 years of experience!
9
Home > Products > Temporary Bailey Bridge >

High Reliable Temporary Steel Pedestrian Q345B Prefabricated Steel Material

High Reliable Temporary Steel Pedestrian Q345B Prefabricated Steel Material

Brand Name ibeehive
Place of Origin Shenyang
Minimum Order Quantity 1 set
Price Negotiable
Supply Ability 20000 tons per month
Delivery Time Shipped in 1 month after payment
Packaging Details Standard export seaworthy package, pallet or as required
Model Number 200
Certification ISO9001-2008 SGS CCIC
Standard ASTM GB BS
Material Q345B/Q460C
Net Width 4.2m
single Span 9-24m
Surace treatment Painted/ Galvanized
Application Civil bridge
Detailed Product Description

200 Type Bailey Bridge With SS (Single Row Single Layer) Q345B prefabricated steel material

 
Product Description:
 

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

 

ZB 200 panel bridge: ZB 200 panel bridge is similar to the compact 100 panel bridge from their appearance.

The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels.

This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.

Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections.

Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges.

Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

 

The delivery situation:

 

 

 

 

 

 

Product Tags: modular bridge construction   prefabricated vehicle bridges  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Shenyang iBeehive Technology Co., LTD.
Subject:
Message:
Characters Remaining: (80/3000)