200 Model Temporary Bailey Bridge Parts Anti - Skid Surfacing Q460C Raw Material
|
200 Model Bailey Bridge Components with Galvanized surface 200 Model panel bridge: ZB 200 panel bridge is similar to the
compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels.
This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.
Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
Modular, pre-engineered, pre-fabricated bridge system • Highly adaptable, fully reusable and re-locatable • Transported in standard ISO containers • Quick and simple to build using labour • Fully galvanized for long life and minimum maintenance • 3.048m module length • 4.2m (single lane ), 7.35m (double lane) • 0.5m ,1m and 1.5m perdestrian footways • Proprietary steel decking systems to suit different loading requirements • Durbar finish or factory applied anti-skid surfacing • Full highway load carrying capability • Simple, cost effective foundations Product Description:
Our Service 1. Our company have three production lines of international advanced level with annual output of 300,000 tons. We produce various specification and models with national standard galvanized steel.
2. All the products based on the national standards and related industrial standards, we always use high-quality material, advanced production technology and production line.
3. We can produce according to the requirements of customer.
4. No matter when, all of our employees follow the principles of scientific management and standard production, better service to establish stable corporation with our customers. |
||||||||||||||||||||||||||||||||||||
Product Tags: prefabricated vehicle bridges temporary bridge construction |
![]() |
Compact 200 Army Temporary Bridge Pre Engineered Building |
![]() |
Q345b Compact 200 Modular Steel Pedestrian Bridge Aisi |
![]() |
ASTM Q345b Steel Temporary Bailey Bridge Construction Army Military |
![]() |
Pedestrian Modular Compact 200 Bailey Bridge Q345b Design Steel Structure |
![]() |
BS Material Q345b Temporary Bailey Bridge Corrugated Steel Decking |
![]() |
Professional Military Standard Compact 200 Bridge Pedestrian |