China Smart Electric Meter manufacturer
WUHAN RADARKING ELECTRONICS CORP.
WUHAN RADARKING ELECTRONICS CORP. Electric Meter, Smart Water Meter, Smart Gas Meter & AMI solution
9
Home > Products > Advanced Metering Infrastructure >

Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

Brand Name Radarking
Model Number RDK-CJQ
Certification ISO9001, ISO4001
Place of Origin Made in China
Minimum Order Quantity 1 nos
Price Negotiate
Payment Terms Western Union, L/C, T/T
Delivery Time 35 days
Packaging Details Standard Package
Installation Direct Connected
Communication wifi/GPRS/RS485/Carrier Communication module
Voltage 220V/230V/240V
Frequency 50Hz/60Hz
Smart Meter Electricity/Water/Gas Meter
Type RDK-CJQ Data Collector
Detailed Product Description
Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

 

1. Product Description

Data Collector with RS485 interface for Smart Electricity Meter Power Grid System can support LV concentrator to complete the data communication channel switching for the smart energy meter of RS-485 communication method, guide rail mounted and compactable with hook mounted design, suitable for the applications where the meter box space is limited and requires only transparent data transmission.

2.Specification:

1Operating Frequency Band470MHz~510MHz / 223~ 230MHzOr Customized
2ModulationGFSK / GMSKConfigurable
3Air Transmission RateDefault 10Kbps, 1.2Kbps~100KbpsOr Customized
4ERP< 17dBm / 20dBm~30dBm 
5RX Sensitivity-116dBm(BER=0.1%,10Kbps) 
6Signal Level Range3.3V / TTL Level / CMOS compatible 
7Air Baud RateDefault 10Kbps, 1.2Kbps~100KbpsOr Customized
8Supply Voltage220V AC -20%~+20% 50Hz,1.9times Standard voltage, no damage within 4 hours 
9Working CurrentTransmit Current≤100mA;Quiescent Current≤50mA 
10Serial InterfaceData Bits 8;Even Parity Check, stop bit 1 
11Software MaintenanceWireless Smart Update 
12Bit Error RateLess than 1% 
13SizeMeet the China State Grid Regulation issued in May, 2013Or Customized
14Technical RegulationMeet the China State Grid Regulation issued in May, 2013Or Customized


 

3. Technical Parameters:

 

1, Operating Power: AC220V±20%,50Hz(single Phase)

2,Static Power Consumption: ≤5W

3,Upward Communication Interface: Radio Frequency ≥300m (open field)

4,Downward Communication Interface: RS-485 bus line. M-BUS bus line, Radio frequency.

 

5,Operating Temperature: -25℃~+55℃

6,Relative Humidity: 5%~95% (non-condensate)

 

4. Installation Requirements:

 

  • Collector Installation Requirements:

4.1.1 Wall mounted, has three fixed holes, can be fixed on the wall surface.

4.1.2 Collector should be installed in the building, if outdoor installation, should configure the outdoor protective box, in avoid the direct sunlight and rain.

4.1.3 Collector should be installed the at the position which the meter is relatively concentrated.

4.1.4 The power supply of collector should be stable, in avoid the data can’t be collect caused by the power outage. The power line adopts the 2×0.5mm2 thickness or thicker wires, and install the earth-leakage protective device.

 

  • Antenna Installation Requirements:

4.2.1 The antenna will be installed at the outdoor or outdoor relative open position, and antenna is towards the concentrator.

4.2.2 The antenna will be within the scope of effective protection of lighting rod and will be more than 1.5 m below than lighting rod.

4.2.3 Install the corresponding frequency antenna according to the antenna terminal instruction on the collector case. Must guarantee the upward and downward antenna communication frequency, channel, concentrator, smart meter correspond strictly when installation. The communication frequency of sucker antenna will be checked the label at the bottom of antenna.

4.2.4 Antenna bracket fixed well, and the antenna base will be fixed firmly on the bracket. Tight the magnet part of antenna head, and also tight firmly the junction between the antenna and collector.

4.2.5 In order to avoid the antenna was surrounded by the metal objects. The antenna position should be far away from the air conditioner compressor, transformer, communication cable,etc.

 

 

 

 



 

Product Tags: automated metering infrastructure   advanced metering system  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: WUHAN RADARKING ELECTRONICS CORP.
Subject:
Message:
Characters Remaining: (80/3000)