China Smart Electric Meter manufacturer
WUHAN RADARKING ELECTRONICS CORP.
WUHAN RADARKING ELECTRONICS CORP. Electric Meter, Smart Water Meter, Smart Gas Meter & AMI solution
9
Home > Products > Smart Electric Meter >

RF / GPRS Three Phase Electric Meter , Digital Electric Meter For AMR System

RF / GPRS Three Phase Electric Meter , Digital Electric Meter For AMR System

Brand Name Radarking
Model Number DTZY150
Certification IEC62053-21; IEC62052-11; IEC62056-21
Place of Origin Made In China
Minimum Order Quantity 50
Price Negotiate
Payment Terms Western Union, T/T, L/C, MoneyGram
Supply Ability 5000000 pcs per year
Delivery Time 35days
Packaging Details Standard Package
Application Industrial
Accuracy Class Active: CL1.0 Reactive: CL2.0
Measurement Active & Reactive Energy
Start Current 0.4% Ib
Voltage Loop Consumption ≤1.5W (5VA)
Current Loop Consumption ≤1VA
Detailed Product Description

RF/GPRS Three Phase Smart Electric Meter for AMR System with DLMS/COSEM Protocol

 

Adding more functions and wireless communication features to the basic DTZY 150 type, the DTZY150-M is built as a three phase four wire or three wire electric meter with extended functionalities for a diversity of metrological measurement and AMR AMI deplolyment. It is a tamper-proof rich multi-rate meter completed in a BS 5685 footprint case, mainly used for commercial and inustrial environments.

 

Main Features:

 

Energy Measurement

 

Total and time-sharing forward active & reactiveenergy measurement

Total and time-sharing reverse active & reactive energymeasurement

Total forward & reverse apparent energy measurement

Save last one to sixteen months energy data

 

Max. Demand Measurement

 

Measure total and time-sharing forward active &reactive maximum demand and time of occurred

Measure total and time-sharing reverse active &reactive maximum demand and time of occurred

Measure total forward & reverse apparent maximumdemand and time of occurred

 

Real Time Measurement

 

Real-time measurement of the phase voltage, current,total active power,

reactive power, apparent power, total power factor, powergrid frequency

 

TOU

 

4tariffs, 100holidays, 14season‐tables, 8time zone‐tables, each table onmaximum 14 time zones

 

Event Log

 

The last 10 records of following events:Power-down,Programing, Cover opening, Terminal cover opening, Reverse power,

PhaseFail.the records include data and time

 

Loadprofile

 

At least 4 loadprofile channels,Recordat least 490days data when time interval is 30 minutes

 

Optical port interface

 

Support IEC62056-21protocol, 1200bps for communication

 

RS-485 serial interface

 

SupportIEC62056(DLMS/COSEM) protocol, 2400bps for communication

 

LCD display

 

Number of digits value field Up to 8

Digit size 6x14.5mm

 

Inputs and outputs

 

Optical test outputs active energy and reactive energy

 

Communication modules(optional)

 

GPRS module:EGSM900/DCS1800 dual-band,support GSM/GPRSphase2/2+ protocol

PLC module: according to Technology Standards of SSC163X ,centerfrequency 270K, FSK modulate technolgy

 

 

Main Parameter: 

 

 

Item Specification
Reference Current1.5(6)A 5(40)A 5(60)A 15(60)A 20(100)A
Reference Voltage3×220V/380V

Dimension (mm)

290×170×85

Working Voltage Range0.8Un~1.15Un
Maximum Working Voltage0.7Un~1.2Un
Working Temperature-25℃~+60℃
Maximum Working Temperature-40℃~+70℃
AccuracyActive 1.0Reactive 2.0

 

 

 Factory setting subject to nameplate 
 For 1.5(6)A meter: Active6400imp/kW·h
  Reactive6400imp/kvar·h
 For 5(40)A meter: Active600imp/kW·h
Constant Reactive600imp/kvar·h
         
 For 5(60)A /15(60)A meter: Active400imp/kW·h
      Reactive400imp/kvar·h
 For 20(100)Ameter:Active300imp/kW·h
     Reactive300imp/kvar·h
         
Pulse Width(80±20)ms       

 

 

Safety precautions:
* Use only isolated tools.
* Place the meter only in dry surroundings.
* Make sure the used wires are suitable for the max current the meter can measure.
* Make sure the AC wires are installed correctly before activating the current/voltage.
* Do not touch the meter connecting clamps directly with your bare hands, with metal, blank wire or other material as you will have the chance of an electricity shock and a possible chance for health damage.
* Make sure the protection cover is placed after installation and has been sealed.
* Installation, maintenance and repair should only be done by a certified electrician.
* Never break the seals or open the front cover as this might influence the functionality of the meter.
* Do not through, drop, kick or other physical violence to the meter as there are high precision components inside that will break or make the meter measure inaccurate.
* Do not mount the meter in area's with harm gas, dust, mildew or insects or on unstable surfaces.

 

 

 

 

 

 

 

 

 

 

 

 

Product Tags: domestic electric meter   digital smart meter  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: WUHAN RADARKING ELECTRONICS CORP.
Subject:
Message:
Characters Remaining: (80/3000)