Balancing Head Board Running Boards for Pulling Rope and Four
Bundle Conductors
Head Boards for pulling rope and 4/6/8 bundles conductor is
specifically designed to connect the pulling rope, with 4/6/8
bundled conductors.
Head Boards for pulling rope and 4/6/8 bundles conductor
Head Boards for pulling rope and 4/6/8 bundles conductor is
specifically designed to connect the pulling rope, with 4/6/8
bundled conductors.The equipment includes the necessary rope
lengths and swivel joints; quantity and models are indicated in the
following tables. Special models with different characteristics can
be designed according to customers' requirement.
Running board for four bundle conductors Technical Parameters
Item Number | Model | Rated Load (kN) | Weight (kg) | Width of Applicable Sheave (mm) | Features |
17231 | SZ4A-13 | 130 | 96 | 100 | Balanced pulley type |
17232 | SZ4B-13 | 130 | 65 | 100 | Conductors are independent of each other. |
17233 | SZ4B-18 | 180 | 95 | 110 | Conductors are independent of each other. |
17234 | SZ4B-25 | 250 | 110 | 110 | Conductors are independent of each other. |
17238 | SZ4C-25 | 250 | 88 | 110 | Conductors are independent of each other. |
17239 | SZ4B-32 | 320 | 150 | 125 | Conductors are independent of each other. |
Application: It is used for stringing 4/6/8 bundled conductors, to
connect the pilot wire rope with conductors. The vertical heavy
links hold running board in horizontal position for correct
entrance into stringing blocks. The balance pulley type is normally
used for 4/6/8 bundled conductors which are pulled from same bull
wheels of tensioner.The running boards are supplied with pulling
rope swivels and conductor swivels to match linepull and tension
requirements.
Special Sizes can be customized.