China Water Well Drilling Rig manufacturer
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
8
Home > Products > Engineering Drilling Rig >

Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler

Browse Categories

Jinzhou City Shitan Machinery Equipment CO. LTD.

City: jinzhou

Province/State:hebei

Country/Region:china

Tel:86--15511892512

Contact Person:
Ms.Anna
View Contact Details

Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler

Brand Name JINZHOU SHITAN
Model Number GK-200
Certification ISO9001
Place of Origin China
Minimum Order Quantity 1 set
Price Negotiation
Payment Terms T/T, Western Union
Supply Ability 2000 sets per year
Delivery Time 7-12 days
Packaging Details Standard Export Package
Product name GK 200 Multi Function Sampling Exploration Engineering Drilling Rig With 295mm Diameter
Hole Diameter Customized
Drilling Depth 200 Meters
Voltage 380v
Rated Boring Diameter 200m
Power Type Diesel
Condition New
Warranty 1 Year
Weight 500kg
Diameter Customized
Application Water Well Drilling ,Geological Exploration
Detailed Product Description

Mining Core Drilling Machine Full Hydraulic Crawler Engineering Drilling Rig

 

 

GK 200 Engineering Drilling Rig Introduction

 

Diesel drilling machine: fast drilling speed, time-saving and labor-saving, convenient to carry, easy to operate,high quality and low price, economical and practical, it is a product in well drilling, piling and drilling equipment

 

GK 200 Customized Engineering Drilling Rig Technical Data

 

Drill rig specification

Drilling depth

200m

Drilling Diameter

91mm,110mm,130mm,150mm,300mm

Drilling rod diameter

50mm

Drilling Angle

90°-75°

Dimensions(L×W×H)

1750×850×1300 (mm)

Weight

880kg/set

Swivel Head

Spindle Speed

115, 230, 505, 790, 1010 r/min

Spindle stroke

450mm

Spindle Dia.

Φ59mmx53mmx4350mm Kelly rod

Upward displacement speed of drilling vertical spindle

0.05m/s

Downward displacement speed of drilling vertical spindle

0.067m/s

Spindle pull-down max

15KN

Spindle lifting capacity max

25KN

Vertical maximum output torque

1.5KN.m

Hoist

Max. Lifting capacity(single rope)

20KN.m

Lifting rotating speed

20; 40; 90; 168r/min

Hoisting drum linear velocity (two levels)

0.17; 0.35; 0.73; 1.5m/s

Drum Diameter

140mm

Wire rope diameter

9.3mm

Wire rope capability

40m

 

GK 200 Customized Engineering Drilling Rig Features

 

1.Wide range if P.R.M and well-set gears

2.Great torque in low P.R.M, fit for coring drilling and piling hole works.

3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.

4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.

5.With light single  cell, can be dismantled and handled easily and safely.

6.Optimized structure, small volume, and lightweight.

 

What aspects should be paid attention to in the drilling process of water well drilling rig?


After the drill bit is drilled into the structure from the drilling platform, the central drilling tool shall be replaced in time. First, you need to clean the bottom of the hole, and then blow off the residue at the bottom of the hole. When the lifting force is sufficient to lift the drill bit, slow lifting force is good.
During the drilling process, the drill bit was summarized, the follow-up situation of the casing was noted, the specific situation of the borehole was determined within a certain time, the borehole was kept clean in time, and the drill bit was put into the drill. You need training. During this process, forced lifting is prohibited.
Sometimes, there will be a lot of residual rock slag at the bottom of the hole of the water well drilling rig, and the rotary part of the eccentric drill bit will be stuck by the rock slag, which will affect its gathering and production. At this time, it is necessary to convey compressed air to clean the hole again, and make the DTH hammer work for a short time, and then carry out the lifting operation of the central drilling tool again.

 

 

 

 

Product Tags: 380v engineering drilling machine   full hydraulic engineering drilling machine   hydraulic crawler engineering drilling rig  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Jinzhou City Shitan Machinery Equipment CO. LTD.
Subject:
Message:
Characters Remaining: (80/3000)