China Refrigeration Condensing Unit manufacturer
Shanghai KUB Refrigeration Equipment Co., Ltd.
Shanghai KUB Refrigeration Equipment Co., Ltd Conduct Code: Listen, Smile, Praise, Appreciate
8
Home > Products > Refrigeration Condensing Unit >

3HP Air Cooled Condensing Unit 380V 60Hz for Cold Storage Freezer

Browse Categories

Shanghai KUB Refrigeration Equipment Co., Ltd.

City: shanghai

Province/State:shanghai

Country/Region:china

Tel:86-021 -63184860-17

Contact Person:
Ms.Amy lu
View Contact Details

3HP Air Cooled Condensing Unit 380V 60Hz for Cold Storage Freezer

Place of Origin Shanghai, China
Model Number MLZ021
Minimum Order Quantity 1
Price $735-800
Voltage 380V 60HZ
Dimension Customizable
Cooling Capacity Medium temperature
Refrigerant R404A
Temperature Range -20-8°C
Weight 100 KG
Compressor Type Hermetic
Condenser Type Air cooled
Horse Power 3HP
Compressor Model MLZ021T9LP9A
Condenser Area 24m²
Refrigerant Receiver 3L
Filter Drier 083S
Solenoid Valve 10mm
Pressure Controller P830E
Detailed Product Description
MLZ021 380V 60HZ Compressor Condensing Unit  Cold Room Small Condensing Unit  Refrigeration 3HP Condensing Unit Price
PartsMLZ021
Model Quantity 
Compressor MLZ021T9LP9A1
Air cooled condenser 24m²1
Fan motor  1
Refrigerant receiver3L1
Filter drier (KUB)083S1
Solenoid valve 10mm1
Pressure controller P830E1
Oil gauge  1
Oil gauge  1
Junction Box 1

 

We offer customize service, OEM welcomed!

Company Information
 
 

  

FAQ

 

Q1: Are you a manufacturer or trading company?

A1:This compressor we are agent , But we are factories that produce condensing units, chillers,Evaporator.

 

Q2: What about the shipping methods?

A2: By express/By air/By sea.

 

Q3: What about the payment methods &payment terms

A3: We accept T/T ,Paypal, Western Union, Cash and etc.After 30% deposit,and 70%balance before the shipment.

 

Q4: What's your delivery time?Where is the loading port?

A4: Usually within 35-60 days after receiving the payment. Loading port:Shanghai,other place in china according your requirement.

 

Q5:Can I have a sample first ?

A5:You have to pay sample cost.

 

Q6: How do you ship the goods and how long does it take arrive?

A6: We usually ship goods by LCL or FCL by sea, by air or express delivery. Usually it takes 30 days by sea, 5-7 days by air or express delivery.

The delivery time is according to the way of shipping.

Packaging & Shipping

 

A. Individuation & Customization

Refrigeration industry, cold storage engineering;

Agriculture,food, restaurant, chemical industry; we can undertake designs according to customer's requirements.

 

B. Excellent warranty

KUB provides up to one year warranty period.

If there is any product quality problems, we will return processing, and is responsible in the end.

We provide excellent service to solve your worries.

 

Product Tags: 3HP air cooled condensing unit   380V condensing unit for freezer   cold storage refrigeration unit  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Shanghai KUB Refrigeration Equipment Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)