China Rock Drilling Rig manufacturer
Beijing Jincheng Mining Technology Co., Ltd.
Survival by quality, Development by credit!
9
Home > Products > Borehole Drilling Rig >

CWD200T Crawler Mounted Water Well Drill Rig 2000m Depth 5500Nm Torque

Browse Categories

Beijing Jincheng Mining Technology Co., Ltd.

City: beijing

Province/State:beijing

Country/Region:china

Tel:86-10-53681788

Contact Person:
Ms.Tina Zheng
View Contact Details

CWD200T Crawler Mounted Water Well Drill Rig 2000m Depth 5500Nm Torque

Brand Name JCDRILL
Model Number CWD200T rotary water well drill rig
Certification CE, ISO
Place of Origin China
Minimum Order Quantity 1 set
Price Negotiation
Payment Terms L/C,T/T,Western Union
Supply Ability 2000 sets/year
Delivery Time 30-45 days
Packaging Details 20GP
Hole Diameter 90-350mm
Hole Depth 2000m
Torque 5500Nm
Rotation Speed 60-115rpm
Drill Pipe Diameter 76/89/102mm
Drill Pipe Length 3000mm
Geology Drilled Air DTH and Mud rotary drilling
Drilling Type DTH & Mud Rotary dril rig
Compressor Type Rotary Screw/Movable air compressor
Engine Type YUCHAI diesel engine
Mud Pump BW250 mud pump
Name CWD200T water well drill rig
Detailed Product Description

Crawler Mounted Rotary Water Well Drill Rig CWD200T

 

>> Introduction

Crawler Mounted Rotary Water Well Drill Rig CWD200T can drill in all kinds of formations by mud drilling in soft formation and air DTH hammer in rock drilling.DTH hammer is applied in rock drilling ,slag is discharged by air pressure and the offstage efficiency is ten times than traditonal rotary drilling.

>> Characteristic

1) The rotary head ,have two gear,rotation speed is 60-115rpm stepless adjustment ans the rotary torque is 5000-6500Nm.
2) The pulling force can be regulated and controlled ,which adapt the machine to deep hole drilling.
3) It can set up a generator which is convenient to weld or illuminate for work at night.
4) Main winch are available on the rig so it is high efficiency when the rig drill on mud rock and on the weathering formation. 
5) The main drive od rig is hydraulic and the four landing legs and drilling tower are hydraulic controlled.Transfer case and mud pump clutch system are also hydraulic operated.
6) The tools winch is used for auxiliary lifting and casin.
7) The hydraulic auxiliary functions are easy and efficient for guide extension,boom swing,boom life,guide dumping.
8) Competitive in price ,low cost of maintain.

>> Specification

SpecificationUnitCWD200T
Geology drilled All Kind
Drilling Type DTH & MUD
Drill system and operation Hydraulic
Hole DiametermmΦ90—Φ350
Hole Depthm200
Rotation TorqueNm5500
Rotation Speedrpm60-115
Drill pipe diametermm76/89/102
Drill pipe lengthmm3000
Max. Feed SpeedM/min80
Max. Lifting SpeedM/min40
Feed Strokemm3600
Max. Pull back CapacityT12
Lifting force of WinchT1.2
Engine  
Diesel Engine type 4Cylinder,water cooling
Diesel Engine Brand YUNNEI
Rated Horse powerKw58
Compressor required(Optional) 
Pressure RequiredMpa1.5-2.5
Air consumptionm³/min15-30
Mud Pump(Optional/Separate or on board)
Model BW250
DisplacementL/Min4
Dimension  
Net WeightKgs5300
Transportation dimensionmm4070*1550*2070
Work Dimensionmm3260*2380*6190
Ground Clearancemm300

 

>> Package & Delivery

>> Our Service

>> Pre-sale service

Acting as a good adviser, our well-trained sales groups and professional technical team propose most rational solutions for our valued client as per practical project requirement.

>> Select suitable model & matched equipment.

>> Strong technical support. Reply clients' questions within 24 hours.

>> Service During Sales

We have responsible team from raw material to finished products, and guarantee 100% pass rate.

>> Design and manufacture products basis of client's special equirement

>> Inspect each machine & matched accessories strictly before delivery

>> Timely inform client of production progress.

 

>> After Sales Service

We're always with you in after-sale service.

>> We can arrange related after-sales representatives for debugging and training at worksite when starting up. >> E-mail, call or door-to-door service in later using.

 

>> Overseas Service&Project

>> FAQ

Q: Are you original manufacturer?

 

Q: Which payment terms are available to us?Q: Which Incoterms 2010 terms can we work?
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
Q: How long will the delivery time take?Q: How about after sales service?Q:Spare Parts When You Need Them
A: Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.

>> Related Products

Product Tags: CWD200T crawler mounted water well drill   2000m depth borehole drilling rig   5500Nm torque water well drill  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Beijing Jincheng Mining Technology Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)