Warehouse H Section Q235 Steel Structure Workshop
|
H section Q235 steel structure workshop Steel structure workshop
The steel structure workshop is a new type of building structure system. This architectural structure system is a main body composed of columns and beams, and a frame structure composed of steel components such as H-shaped steel, C-shaped pur strip, Z-shaped pur strip and U-shaped pur strip.
The roof and walls use various panels and other components (such as doors and windows) to form a closed system. The advantages of steel structure buildings are wide application range, high span, high strength, light weight, low cost, temperature protection, energy saving, beautiful appearance, short construction time, good insulation effect, long service life, space saving, and good seismic performance. Flexible layout etc.
We can provide customized solutions according to your requirements. Different styles of materials can be used for roof and wall panels, doors and windows, which can provide a unique solution for your workshop construction.
Technical Parameters
Steel structure workshop introduction The steel structure workshop is the most common door type steel
structure. The portal steel frame is a traditional structural
system. The upper main frame includes rigid frame beams, rigid
frame columns, supports, purlins, tie beams, etc. Principles of Mechanics The steel structure workshop is mainly composed of a horizontal
steel frame, which is composed of columns and beams. The steel
frame is a plane force system. Set up a ceiling and column support
to ensure longitudinal stability. Steel frame Rigid frame columns and beams made of H-shaped steel, and various
loads are transferred to the foundation through the columns and
beams. Struts, beams The rigid struts are made of hot rolled steel (usually angle
steel). The flexible support is rod steel. The connecting beam is a
circular steel tube forming a closed system with supports. Roof purlins, wall enclosures Generally C-shaped steel and Z-shaped steel. Withstand the force
transferred from the roof and wall panels, and transfer the force
to the columns and beams. Steel structure workshop closed system The prefabricated steel structure workshop building is very
durable. It is strong enough to withstand heavy snow, high winds
and strong earthquakes. The walls and roof coverings are coated
with aluminum compounds to prevent rust and extend the life of the
panels. The steel structure workshop building is not flammable, so
it is not easy to be destroyed by fire. It makes the workshop
building very suitable for storing hazardous chemicals. After the metal cladding of the steel structure workshop is
completed, it can be overlapped during assembly. It leaves no
openings, so the building can be isolated from the outside world.
It helps keep buildings warm in winter and cool in summer, thereby
saving energy costs. 1. Features: fast and flexible assembly, safe and reliable, heat and sound
insulation, waterproof and fireproof. 2. Cost-effectiveness: quick and easy installation greatly shortens the construction time
and reduces the cost; 3. Durability: The entire structure is easy to maintain, and the service life can
reach more than 50 years. 4. Perfect design: The ideal design completely avoids leakage and water seepage. At
the same time, it also meets the national fire protection
standards. 5. Carrying capacity: it can resist the influence of strong wind and earthquake, and
bear the load of heavy snow Installation and maintenance of steel structure workshop Installation sequence of steel structure workshop: Installation of steel columns→support between columns→temporary
installation of steel suspension beams→roof beams, roof
supports→correction and fixation of steel suspension beams→roof
panels, wall panels→trim panels, waterproof panels, windows and
doors installation. maintenance:
All steel components in the steel structure workshop are connected together to form a closed structure. Therefore, the wires of the lighting equipment cannot be directly tied to the steel structure, and the wire tube or channel needs to be isolated from the steel structure, thereby avoiding electrical conduction.
For steel parts exposed outdoors, if the workshop is built for more than five years, the exposed structure must be painted and maintained. It can not only prevent parts from rusting, but also extend the service life of metal buildings.
After the installation is completed, the owner shall not change the original structure of the factory building. And can not increase or decrease the partition wall or any structural components. The owner needs to contact the steel structure manufacturer for advice. Only after professional calculation and judgment, the manufacturer can get the result of whether it can be modified.
Branches, leaves and similar items in the steel structure workshop should be removed in time to avoid unnecessary trouble caused by the backlog.
If the metal coating surface of the steel structure workshop is damaged, it should be repaired in time to prevent the surface of the metal plate from being exposed to sunlight and rain.
The cleanliness of the outer wall of the steel structure workshop mainly depends on the environment. When cleaning the surface, care must be taken to avoid scratches. Avoid using bleaching ingredients and abrasive cleaning products, such as steel wool and abrasion-resistant products. And rinse from top to bottom with clean water.
Advantages of steel structure workshop The steel structure workshop has the advantages of large span, light weight, low cost, heat preservation, energy saving, space saving, and good seismic performance. It is very suitable for building construction.
1) The steel structure workshop is sturdy and durable and can withstand heavy snow or earthquake. Our team will calculate according to your local wind and snow load, and then select the appropriate size and structure to ensure that your equipment has a service life of up to 50 years.
2) The prefabricated steel workshop is installed quickly. During the construction process, all components are manufactured in the factory and then shipped to the site for installation. No construction waste will be generated during construction. It is more environmentally friendly than traditional concrete structures and belongs to green buildings.
3) During installation, the cladding of the roof and the wall will overlap with no gaps. Insulation can add surface to ceilings and walls. The whole building is warm in winter and cold in summer, thus saving heat and air conditioning consumption and energy. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Product Tags: Q235 Steel Structure Workshop H Section Steel Structure Workshop EPS Roof Steel Structure Warehouse |
![]() |
Strong Stable Prefabricated Steel Structure Workshop Building For Heavy Duty Work |
![]() |
One Stop Solution For Prefabricated Steel Structure Workshop Building Project |
![]() |
Customizable Steel Structure Workshop For Various Applications |
![]() |
Nice Outlook 50 Year Life Span Rigid Frame Steel Structure Workshop Project |
![]() |
Custom Designed Steel Structure Workshop For Industry Construction |
![]() |
Long Life Span Rigid Frame Industry Prefabricated Metal Structural Workshop Project |