Cost-effective Projects prefabricated steel frame structure construction workshop building
|
|
Cost-effective Projects prefabricated steel frame structure construction workshop building
Steel Structure Building Main Materials:
Material Q345/Q345B or Q235/Q235B Steel, Straight or Variable cross-section
X-type or V-type or other types bracing made from round, angle pipes etc.
C or Z type: Size from C120~C320, Z100~Z200
Single Colorful Corrugated Steel Sheet
Sandwich panels with Rockwood, Fiber glass, EPS/FOAM, PU etc.
High Strengthen Bolt, Flange Bolt, Self tapping screws,HS Bolt, Normal Bolt, Post feet Bolt.
Skylight Belts, Ventilators, Down Pipe, Rolling or Sliding Door, PVC or Aluminum Alloy Windows, Gutter etc.
Two lays of Anti-rust Paint, Galvanized, painting,
Steel structure advantages:
1. Environmental friendly
Why us ?
Quality control system
· After loading containers, Every steel member ( serial no. from your drawings) will be marked in the loading container list, then we will send to you, you could check the container list to find every member.
Our equipment :
What we can do for you ?
1 supply you the high quality steel structure products with competitive price.
2 we can design as your detailed requests to ensure our product is only the best for you.
3 if you have drawings, we could help you modify and optimise it. that will make your design is cost- effective design. make it easy installation and save the material. also need to meet your requests. (that is our unique advantage)
4 we could supply the installation service. we can send our engineers to help you install the steel structure. and if neccessary we also could send workers to install it, but i do not think that is a good idea to make it cost-effective. O(∩_∩)O
5 make the tolerance of weight within 6%, (between construction drawings and actual weight).
Quality control
QC/Technical Support
Our customer
Loading
At currently we have three types loading plan as below:
1 We use 4O"HQ container, This way we loading and unloading is very slow and diffcult. But this way is the lowest cost.
2 We use 40" OT container, we can load all members easily. and good way to protect the possible damage during shipping. But that will cost more ocea freight.
3 We still use 40" HQ, but we could make a steel pallet to put all members on it. And then we push it into the container, this way is the fastest way to loading and unloading, and we can make the pakage to project any damage during shipping. But the steel pallet will cost about 1800 usd per pc.
|
||||||||||||||||||||||||||||||||||||||||||||||||||
| Product Tags: prefabricated steel construction structural steel frame construction | ||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Ultimate Solution for Steel Structure Construction Prefabricated Workshop Buildings |
|
The Best Solution for Steel Structure Construction Prefabricated Workshop Buildings |
|
High Stability Steel Structure Construction for Durable and Warehouse Design |
|
Industrial Workshop Building With Sandwich Panel Customizable Design For Steel Structure Construction |
|
Resistance To Corrosion Steel Structure Construction Long-Lasting Durability Portal Rigid Frame |
|
High Strength Prefab Steel Structure Long Lasting Stable Buildings |
