China Construction Site Hoist manufacturer
Xiamen Comwinning Imp.&Exp.Co.,Ltd
Supply the world class Construction Lifts for the users. TUV approved products. Xiamen Comwinning Imp. & Exp. Co., Ltd. / KANGBO MACHINERY GROUP
8
Home > Products > Building Site Hoist >

Rack And Pinion Lifting 36M / Min Building Site Hoist

Browse Categories

Xiamen Comwinning Imp.&Exp.Co.,Ltd

City: xiamen

Province/State:fujian

Country/Region:china

Tel:86-592-6384601

View Contact Details

Rack And Pinion Lifting 36M / Min Building Site Hoist

Brand Name KANGBO
Model Number Building site rack and pinion hoist SC200BD MP-B05 SC200/200BD MP-B06
Certification TUV, CCC
Place of Origin CHINA
Minimum Order Quantity 1 set
Price Negotiate in USD
Payment Terms T/T, L/C
Supply Ability 150 sets per month
Delivery Time 25-30 days
Packaging Details Export package
Type Building Site Hoist
Lifting Speed 0–36 M/Min
Material Q345B cool roll steel plate
Production Standardized production, Processed by CNC machines, Laser, Robots in assembly line
Finishing Sandblasting and paint
Color Multi Colored
Detailed Product Description

Rack And Pinion Lifting Speed 0–36 M/Min Building Site Hoist

 

Building Site Hoist Introduction

 

This product absorbs advanced technology at home and abroad, is novel in design, simple in operation and convenient to dismantle and repair. Its safety design and configuration is fully in conformity with national standards. It is mainly suitable for bridge, chimney, building and other high-rise building builders and cargo transportation, and can also be used in warehouses, wharfs and other places where vertical transportation needs to be used.

 

Building Site Hoist Features and Advantages


* The material hoist runs without vibration or trembling. The man and material lift starts and stops without surging or jerking.
* The passenger and elevator is reliable with very little breakdown and is durable with very long work-life.
* Adopt energy-saving helical reducers made specially for rack and pinion elevators, extremely strong, reliable and durable.
* Racks centering at mast reduce partial load torque of builders hoists, makes the construction hoists run more stably and smoothly.
* Applying non-eccentric rollers, make the installation of construction site elevators be faster and easier, with much less error.
* The integrated elevator car roof, which made by a steel plate with edges fully welded one time to complete, enhance hoist cage strength and ensure no water leakage.
* The additional big size third door at the cage side let the users to use fork trucks to load/unload extremely heavy and big size materials.
* Easy access to electrical panels of elevator for maintenance.
* The material elevator car frame is enlarged and strengthened.
* The elevators are equipped with full set of safety facilities, including centrifugal brake, limit switches, Electromechanical interlocks.
* Frequency control unit (FC), with closed-loop, which gives the passenger and material hoists very smooth starting and stopping with low starting current and less wear and tear.

 

Building Site Hoist Techical Data 

 

Item & Article No.SC200BD, MP-B05; SC200/200BD, MP-B06
Payload Capacity2,000 KG per Cage
Lifting Speed0–36 m/min.
Max. Lifting Height450 m
Cage Size (internal)3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage
Cage Doors3 doors, Entry Door + Exit Door + Side Door
Motor ControlFC (Frequency Control)
Engine Power2x11 KW per Cage
GearboxHelical Gearbox
Safety Device TypeCentrifugal Brake
Power Supply Range380–500 V, 50 or 60 Hz, 3 Phase
Type of MastSquare Column 650*650 mm with Bolted Rack
Length Mast Section1.508 m
Rack Module8

 

Building Site Hoist Pictures

 

Product Tags: 36M / Min Building Hoist   Rack And Pinion Lifting Hoist  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Xiamen Comwinning Imp.&Exp.Co.,Ltd
Subject:
Message:
Characters Remaining: (80/3000)