Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace

Brand Name Ruideer
Model Number 630,530,430
Certification CE
Place of Origin China
Minimum Order Quantity 1 set
Price Negotiable
Payment Terms L/C, T/T
Supply Ability 5-6 months/set
Delivery Time 5-6 months
Packaging Details wooden cases
Process temperature((℃) 700-1050
Types of coating TiC、TiN、TiCN、a-AL2O3、K-AI2O3
Detailed Product Description

Customized Cvd Lab Vacuum Furnace Chemical Vapor Deposition Cvd Coating Furnace

 

What is Chemical Vapor Deposition?

   Chemical vapor deposition is a process that involves the reaction of a volatile precursor which is injected into a chamber (typically under vacuum). The chamber is heated to a reaction temperature that causes the precursor gas to react or break down into the desired coating and bond to the material surface. Over time the coating material builds on the surface and creates a coating throughout the exposed part's surface. So for example if we wanted to bond silicon to a surface we may want to use a trichlorosilane precursor. When the trichlorosilane is heated in the coating chamber the decomposition and coating reaction may look like this.

      SiHCl3 → Si + Cl2 + HCl

 

    CVD Coating Machine is a state-of-the-art vacuum coating technique, which utilizes chemical deposition equipment to deposit a thin layer of material onto the surface of a substrate. This type of surface coating apparatus offers a wide range of coating speeds, from 0.1 to 2.0m/min. It also provides a precise and uniform coating pressure, with a pressure stability of -±2mbar. The heating system is electric heating, which ensures a stable substrate temperature for optimal coating results. The whole process is controlled by a PLC system, which ensures precise coating thickness and uniformity. This CVD Coating Machine is ideal for a variety of CVD coating applications.

 

EquipmentmodelCVD430-1250CVD430-1600CVD530-1250CVD530-1600CVD630-1250CVD630-1600
Effective space(mm)Φ400X1250Φ400X1600Φ500X1250Φ500X1600Φ600X1200Φ600X1600
Heating power(KW)394845556580
Quantity of heating zone454545
Equipment footprint(mm)6000*5800*48006000*5800*51006500*6000*48006500*6000*51007200*6200*48007200*6200*5100
Process temperature(℃)700-1050
Precursors and process gasesTiCL4,AICL3,CH3CN,H2,N2,Ar,CH,CO,CO2,HCI,H2S
Types of coatingTiC,TiN,TiCN,a-AL2O3,K-AI2O3
Optional equipments

1. Off gas neutralizer (incl.evacuating device);

2. Second stage gas distributor (incl.,pipeline);

3. Gas station (incl.pipeline)

 

• Design standards

 

The equipment is designed in accordance with the pressure vessel requirements of the Quality and Technical Supervision Bureau, and is qualified after pressure testing and shipped. The electrical design and construction meet national standards.

 

• Installation pre-test and pre-acceptance

 

The equipment is fully assembled in our factory, including all pipelines, vacuum pipelines, process gas pipelines, cooling water pipelines, compressed air pipelines, etc. Pre-testing can be carried out after installation. At the customer site, pipelines other than the equipment are provided by the customer. The installation also includes the connection of all cables. At the customer site, the main cable connecting the power cabinet is provided by the customer. After installation, we conduct vacuum and positive pressure leakage tests on the entire equipment, as well as mechanical and electrical function tests.

 

• Disassembly and transportation

 

The equipment will be disassembled in several large parts, packed in a standardized manner, and loaded into the transport vehicle.

 

• Customer site installation and commissioning

 

The Redel after-sales engineer will lead the team to complete commissioning, product trial burning and other work within 20 working days. The customer needs to make appropriate preparations and provide the necessary tools, such as hoisting and lifting equipment. And provide installation personnel support (it is recommended to have 1 mechanical personnel and 1 electrical personnel).

 

• Final acceptance

After installation and commissioning, the equipment can be finally accepted in accordance with the requirements of the technical contract.

 

• Training

Our after-sales engineers will provide a systematic and complete on-site training, including operation, maintenance, troubleshooting, etc.

 

• Technical data delivery

 

To ensure safe operation and equipment maintenance, the following technical data will be provided to customers:

 

1. Equipment installation layout

2. User manual

3. Spare parts list

4. Electrical drawings

5.  Component manual

 

FAQ

Are you a factory or trading company?

Q: Are you a factory or trading company?

A:We are China leading high-temperature vacuum furnace manufacturer with over 10 years’ experience.

Do you have customization or OEM service?

Q: Do you have customization or OEM service??

A:Yes,we have powerful R&D team and high-tech equipment.So we can not only supply the regular model,but also the customizable furnace as the repuirment of our clients.

What's your advantage?

Q:What's your advantage?

A:

l Quick response to your enquiry

l High quality control

l Stable supply chain

l Timely delivery

l Excellent after-sales service

Product Tags: Customized Cvd Lab Vacuum Furnace   Chemical Vapor Deposition Cvd Coating Furnace   Cvd Coating Furnace  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Subject:
Message:
Characters Remaining: (80/3000)