Complete Production Line laterite nickel furnace calcination rotary
kiln |
Product Description Name | laterite nickel furnace calcination rotary kiln | Equipment name | Rotary kiln | Specification | Φ5.5×115m | Application | Roasting laterite ores | Amount | 1Set | Output | 80-100(roasted sand)t/h | Driving mode | Double driving | Type of thrust roller | Hydraulic thrust roller | No. of support | 4 | Slope ( sine) | 3.0% | Driving mode | Bilateral double-driving | Main driving | 0.2~1.2r/min | Auxiliary driving | 6.7r/h | Sealing mode of kiln head | Sheet steel (provisional) | Sealing mode of kiln end | Air cylinder | Cooling of kiln head | Air cooling | Rotating direction | Clockwise (from discharging end) | Total weight | 1648 ( excluding feed and discharge cover)t | Temperature of discharged materials | 750~850°C | Temperature of waste gases | 200~400°C | Thickness of refractory bricks | 230mm |
Description of Lateritic Nickel Rotary Kiln: Our lateritic nickel rotary kiln is mainly used to smelt lateritic
nickel ores so as so get nickel pig iron. So far CITIC HMC
Co., Ltd has successfully carried out many projects in China, such
as Guangqing in Guangdong Province, Dingxin in Fujian Province,
Qingshan in Zhejiang Province, Linyi in Shandong Province, and
more. LUOYANG ZHONGTAI Lateritic Nickel Rotary Kiln technical
characteristics: ♦ Kiln body is made of high quality composed of carbon steel or
alloy steel plate and automatic welding; ♦ Tyre,Support Roller,Open gear adopts alloy cast steel; ♦ Sliding bearing with large gap not scraping tile bearing; ♦ Transmission device adopts hard tooth surface reducer, flexible
diaphragm coupling, dc motor; ♦ Adopts hydraulic gear wheel; ♦ Preheater scales were used respectively to veiw of kiln head, and
cylinder pressure tight seal; ♦ A slow drive device. |
FAQ Q: Why we believe in luoyang zhongtai industries co., ltd: A: 1. More than 30 years experience. 2.We are the leading professional supplier of
mining machinery, construction machinery, machines casting and
forged parts 3. All products achieved ISO9901:2000
quality management certificate and CE, ROHS certificates. Q:Delivery time A: parts lead time 1-2months, machines 2-3months. Q:Payment terms A: Accept payment type: T/T, L/C, Western union,Cash. 30% deposit when signed contract. Full payment paid before shipping Q: Quality warranty? A: guarantee time: one year for main machinery. If something wrong
we will provide the technical advice and find solution immediately.
For those wearing parts we guarantee high quality parts for
long-term supply. Q: After sales service? A: we can supply technical guide for machines running test and
parts maintenance if end user needs. |
|