China Drilling Mud Equipment manufacturer
Shaanxi Aipu Solids Control Co., Ltd
Aipu Solids Control-All your solutions on solids control
6
Home > Products > Drilling Shale Shaker >

Dual Deck Drilling Shale Shaker

Dual Deck Drilling Shale Shaker

Brand Name Aipu
Model Number MG
Certification API ISO
Place of Origin China
Minimum Order Quantity 1 set
Price USD11678-14598/Set
Payment Terms L/C, T/T
Supply Ability 30 sets per month
Delivery Time 7 days
Packaging Details Sea worthy. One set per package.
Screen type Framed
Screen installation Pressed by wedge block
Screen panel 4
Shaker screen area 5.46㎡
Shaker basket material High quality Carbon steel, or custom-built
Color Cyan, Blue, Orange, Green, etcetera
Feeder box Available and customizable
Vibration mode Linear motion
Vibrator motor brand Martin, Oli, or Ital-Vibras
Detailed Product Description

Tandem Dual Deck Shale Shaker For Drilling Mud Waste And Direction Boring

Schematic description

Dual-deck shale shaker, also be called double layer screen shale shaker, is a fitful device on drilling mud management or horizontal boring (horizontal direction drilling). Tandem shale shaker manufactured by aipu solids control have demonstrated higher flow rates with all types of mud than other well known mud shale shakers. The horizontal shaker screens allow longer slurry retention time and provide more volume sq.ft. of screen than traditional shakers.

 

Dual deck shaker is one of type shale shakers. As we know, it has two decks: the top deck use coarse screen and the bottom deck use fine screen. The biggest benefit of use dual deck shale shaker is reduced the number of shakers required on solids control system and can deliver high processing capacities.

Aipu MG series shale shaker on working


The tandem shale shaker is to put 2 unit single shale shakers on one skid. Normally these two unit shale shakers are completely same to ensure the easy operation and maintenance in future.

 

Advantages of Tandem Shale Shaker

1. Tandem shale shaker could be used flexibly as per the drilling fluids flow rate. For drilling site, mostly two units shale shakers are needed. Sometimes one shaker is working while the other is stand-by; sometimes both of the two shakers will work at full capacity.
2. As the tandem shale shakers are mounted on the same one skid. For site installation and dismounting, only need to use a crane to lift the whole skid to put on tank top or take it off from the tank.
3. Convenient transportation. In designing and manufacturing the mounted skid, with consideration of easily putting on flatbed trailer, the skid is made with container type fixing points.

 

MG shale shaker specification

ModelHunter MG3Hunter MG4Hunter-MGD
Handling Capacity110 m3/h140 m3​/h140 m3​/h
Screen Area2.04 m22.73m22.73m2
Screen Number3 sheets4 sheets4 sheets
Max. Vibration Strenth7.0 G7.5 G6.0 - 7.0 G
Deck Angle-1 ~ +5o-1~+5o-1~+5o

 

 

 

 

 

Product Tags: Dual Deck Drilling Shale Shaker   Dual Deck Shale Shaker   Dual Deck Drilling Shaker  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Shaanxi Aipu Solids Control Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)