Full Polyurethane Running Track Surfaces Drier And Line Marking
|
Non Toxic Outdoor Sports Surfaces Durable Full PU Athletic Track Red
Description
The full polyurethane running track surfaces are globally
recognized. The full polyurethane Multi-layer system, consist of cushion layer and top coating layer.
Quick detail
1 . CLASSIC SERIES- FULL PU ATHLETIC TRACK CLASSIC series is the excellent successor of traditional polyurethane running track materials which can be dated back from 1979. Through continuous research and optimization by BSMC, CLASSIC series become greener and greener, and more and more scientific, obtaining the IAAF certificates and customers' favor. CLASSIC series is comprised of cushion system, strengthen system and decorated surface, scientifically and perfectly meet the balance of sports performance and sport healthy, fulfilling all the physical property requirements of "IAAF IAAF Track and Field Facilities Manual". CLASSIC series also features green technology, certificated by RoHS and CEC (China Environmental United Certification Center).CLASSIC series is always a satisfied solution to outdoors all-weather synthetic surface.
2 . Benefits:
3 . Features:
4. Full Pu Athletic Track Instructions:
Perfect integration with nature, only need to add a very small amount of water in the plastic, mix for 2 minutes evenly, spray on the base wait 24 hours to dry naturally, and then spray EPDM anti-skid surface twice, can be completed. Short construction period ,about 1 week.
5 . Applications:
6.Application Area
PU 4:1 Full-pu track material is used as a sandwich system which provides good force reduction and is construction on a casr in place basement of rubber crumb applied with clear PU binder, the base layer is sealed with a combination of rubber dust and two component PU material, with a final topping coating and EPDM rubber granule broadcast onto a flood coat of PU compound. PU 4:1 Full-pu track material is also used as Full-PU system is a high performance system cast in place with two layer recycle SBR granule mixed with elastic PU flood coat and finished with a topping of EPDM rubber granule broadcast onto the PU compound.
7 . Production superiority
8 . Project photos:
9.Maintenance:
Quote: 24 hours services. Site Visit: provide supervisor to check the condition on the spot and welcome customer visit us. Installation:We provide supervisor to help install. Maintenance:Warranty period for 2 years.
10.Our Services
11. FAQ:
Q7:What is the Production time? A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.? A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track? A:The life span is about 10-15years.
Q10:I am Interested in Synthetic track surface,what is the best choice? A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system. Spray coating:Price competitive , permeable and surface paint by machine, more
suitable for school or practice project Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.
|
|||||||||||||||||||||||||
Product Tags: Full Polyurethane Running Track Surfaces IAAF Running Track Surfaces |
![]() |
Synthetic Flooring Outdoor Sports Surfaces Multi Purpose |
![]() |
Basketball Courts Pu Sports Flooring 8mm Thick ISO18001 |
![]() |
Indoor Basketball Silicone Pu Sports Flooring concrete Subbase |
![]() |
1-3mm Sports Floor Surface EPDM Color Rubber Granule Soft Rubber Floors |
![]() |
odorless EPDM Rubber Granules Sports Floor dustproof 8mm epdm surface |
![]() |
8MM Eco Outdoor Sports Surfaces Permeable Running Track Flooring |