Construction Large diameter High Strength Hot Rolled Spiral Round
Carbon Welded Steel Pipes Product Advantages 01.Anticorrosive:17 years in heavy industrial areas. 02.Cheap:The cost of hot-dip galvanizing is lower than that of
other coatings. 03.Reliable:The zinc coating is metallurgically bonded to the steel
and forms part of the steel surface,so the coating is more durable. 04.Strong toughness:The galvanized layer forms a special
metallurgical structure that can withstand mechanical damage during
transportation and use. 05.Comprehensive protection:Every part of the plated piece can be
galvanized,and is fully protected even in depressions,sharp
corners,and hidden places. 06.Save time and energy:Galvanizing process is faster than other
coating methods. Commodity | EN 10219 ASTM A500 Welded ERW Steel Pipe | Outer diameter | ERW / HFW | LSAW / DSAW | SSAW / HSAW | RHS | SHS | | 1/8 - 20 inch (10.3 - 508 mm) | 12 - 56 inch (323.8 - 1420 mm) | 8 - 126 inch (219 - 3200 mm) | 40 x 20 mm - 1000 x 800 mm | 15 x 15 mm - 1000 × 1000 mm | Wall thickness | 0.4 - 16 mm | 6.0 - 40 mm | 6.0 - 26 mm | 1.0 - 30 mm | 0.6 - 30 mm | Length | 5.8 ~ 12.0 m or upon customers' requirements | Standard | GB/T 3091, GB/T 13793, ASTM A252, ASTM A53, ASTM A500, EN 10210, EN
10219, API 5L, DIN 1626/1615, DIN 17120, etc. | Grade | SS400, Q235, Q345, Q460, A572 Gr.50, A572 Gr.60, S235, S275, S355,
Grade A/B, X42, X52, X60, X70, etc. | Surface | Prime quality (bared, oiled, color paint, 3LPE, or other
anti-corrosive treatment) | Inspection | With Chemical Composition and Mechanical Properties Analysis; Dimensional and Visual Inspection, also with Nondestructive
Inspection. | Application | structure, electric power transmission tower projects, piling,
water, oil & gas pipeline engineering, mechanical industry, municipal projects, roads and its auxiliary facilities, etc. | Packing | Standard export, in bulk / bundles / nylon fabric bags with
seaworthy packing; or according to customers' requestments. | Delivery Time | 1. 20-45 days after received deposit or confirmed L/C 2. Depends on your oder quantity | Payment Terms | 1. T/T: 30% T/T advance, 70% balance copy of B/L 2. L/C: at sight 3. T/T and L/C: 30% T/T advance, 70% L/C | Port | China main port |
|