China Elbow Hot Forming Machine manufacturer
Cangzhou Junxi Group Co., Ltd.
Choose Cangzhou Junxi International Trade Co., Ltd. ,choose success!
7
Home > Products > Seamless Pipe Fittings >

Sch140 Cold Forming Buttweld Carbon Steel Reducing Tee

Sch140 Cold Forming Buttweld Carbon Steel Reducing Tee

Brand Name HUAWEI
Model Number 1/2-120 INCH
Certification CE
Place of Origin CHINA
Minimum Order Quantity 100 PCS
Price negotiable
Payment Terms L/C, D/A, D/P, T/T
Supply Ability 100 PCS/MONTH
Delivery Time 20 DAYS
Packaging Details WOODEN BOX
Material Carbon steel
Connection buttweld
Size 1/2"-24"
Application Connect Pipes
Packaging Pallet/ wooden box
Standard of carbon steel pipe fittings: ASME
Head Code Round
style equal tee
Raw material pipe Seamless steel pipe
Detailed Product Description

Seamless Pipe Fittings cold forming forged pipe fitting Carbon steel equal tee

Product Description:

Typeseamless/erw/semi-seamless 1D-100D
Thicknesssch10,sch20,sch30,std,sch40,sch60,xs,sch80, sch100,sch120,sch140,sch160,xxs
StandardASME B16.9 ASTM JIS DIN
Size1/2”-24”
Surface treatmentbevelling,shot blasting,marking,painting according to customer requirement
Packagingfabric bag & wooden box & pallet
Delivery10-15days

 

Product Show

 

 

 

1. Hydraulic bulging

The hydraulic bulging of the tee is a forming process of compensating the bulging of branch pipe by the axial direction of metal material.The process is to use special hydraulic press, with three links within the tube billet diameter equal injection liquid, through the two horizontal side of the hydraulic cylinder synchronization of the motion of tube billet, billet after squeezed smaller volume, smaller volume of liquid with the tube billet inside the tube billet and pressure, when pressure tee branch pipe bulge out to the metal material in the liquid in the cylinder and the pipe pressure under the dual role of flow along the mold cavity and the branch pipe.

The hydraulic bulging process of the tee can be formed in one time with high production efficiency.The head and shoulder wall thickness of the tee are increased.

 

2. Hot pressing

Hot pressing is to flatten the pipe billet larger than the diameter of the tee to the diameter of the tee. Cold drawing tee opens a hole in the part of the stretch branch pipe.The tube billet is heated, put into the forming die, and the punching die of the stretch branch pipe is loaded into the tube billet;Under the action of pressure, the tube billet is compressed radially. In the process of radial compression, the metal flows towards the branch tube and forms the branch tube under the stretching of the die.The whole process is formed by the radial compression of the tube billet and the stretching of the branch tube.Different from the hydraulic bulging tee, the metal of the hot pressing tee is compensated by the radial movement of the tube billet, so it is also called radial compensation process.

 

 

3. Stitching and forming

Use short pipe welding (or bonding) to form, save material, reduce cost.However, it is necessary to ensure the reliability of the welding (or bonding) process, and make corresponding joint inspection when necessary, such as pressure test, flaw detection, magnetic powder, etc.

 

 

4. Forging forming

Because of the limitation of equipment and processing conditions, forging tee is generally of small caliber.Processing costs are relatively high.

 

 

 

Contact me:

Darcy Dong

Whatsapp/ Wechat: 008615630731167

Guozhong International Limited

Product Tags: buttweld carbon steel reducing tee   carbon steel buttweld reducing tee   sch140 carbon steel reducing tee  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Cangzhou Junxi Group Co., Ltd.
Subject:
Message:
Characters Remaining: (80/3000)