China Dredger Ship manufacturer
Leader Dredger Co., Ltd
Leader Dredger Co., Ltd.
6
Home > Products > Cutter Suction Dredger >

Energy Saving Hydraulic System Sand Suction Dredger 14 Inch Cummins Engine

Browse Categories

Leader Dredger Co., Ltd

City: weifang

Province/State:shandong

Country/Region:china

Tel:86-132-2073-1669

Contact Person:
Mr.Victor Lee
View Contact Details

Energy Saving Hydraulic System Sand Suction Dredger 14 Inch Cummins Engine

Brand Name Leader Dredger
Model Number LD1200
Certification ISO 9001
Place of Origin China
Minimum Order Quantity One Dredger
Price Free Consultation
Payment Terms L/C, T/T
Supply Ability 20
Delivery Time Peak season lead time: 1-3 months ; Off season lead time: 1-3 months
Packaging Details In Container Or Bulk Vessel
Type Cutter Suction Dredger
Power Type Diesel
Inch 12 ~ 14Inch
Dredging depth (m) 14
Main engine power (kw) 601
Auxiliary engine power (kw) 160
Pipe diameter (mm) 350
Application River Dredging, Lake Dredging
Customized Customized
Condition New
name sand dredging equipment
Detailed Product Description

Energy Saving Hydraulic System Sand Lake Cutter Suction Dredger 14 Inch Cummins Engine

 

I. Energy Saving Hydraulic System Cutter Suction Dredger Description

 

The energy saving hydraulic system cutter suction dredger designed by Leader Dredger can reduce the operating cost of dredgers, and at the same time can guarantee the same power as other dredgers. This design can reduce daily operating costs for customers in the long run This is great .


For the hydraulic sysytem of cutter suction dredger, this is very practical, and the number of staff can be well saved through the hydraulic system. And can operate the equipment of the whole ship through the console.

 

2. About Leader Dredger Cutter Suction Dredger Service:

 


1. A customer questionnaire will be provided before the customer purchases, and the ideal cutter suction dredger will be recommended to the customer according to the actual situation of the project. When the conventional series of cutter suction dredger cannot meet the requirements, Leader Dredger can customize the dredger for customers.

 

2. Leader Dredger will add additional equipment or reduce the standard equipment according to the requirements, so that customers can have a more reasonable cutter suction dredger

 

3. Leader Dredger provides installation instructions now to help customers conduct driving training for operators

 

4. Leader Dredger provides one-year after-sales service and provides permanent parts consulting services

 

3.Cutter Suction Dredger Desgin

 

• Hydraulic pumps drive cutter, winches spud rams

 

• Main engine drives pump through gearbox

 

• pump inside engineroom

 

• Design of high production long distance and reliability, easy control, simple maintenance

 

• Australian technology pump

 

• Famous European-brand electric system and hydraulic system

 

• Engine room big and cool, and easy to maintain

 

• Dredge can be equipped with several options such as

 

Anchor booms/Spud carriages/Increasing The Dredging Depth/Self-Propell/Pump Booster station/GPS dredging System

 

4. LEADER DREDGER LD1200IP TECHNICAL SPECIFICATIONS

 

Dredging Features

Standard dredging depth(m) Maximum mixture12m
capacity(m/h)1200m³/h
Solid capacity(approx)240m³/h
Dredging pump mode350/300mm
  

Principal characteristics

Overall length(m)28m
Breadth(m)6.8m
Draught(m)1.3m
Discharge distance(m)700m
Total dry weight approx(MT)120MT
Ladder length16m
  

Dredge pump: Australia technology Pump

By alloy cast iron material for better abrasion resistance, abrasive, hardness, more than68HRC. Bigger working capacity, more efficiency, driven through gearbox.
Maximum mixture capacity(m/h)1200m³/h
Solid capacity(approx)240m³/h
  

Engine

Main diesel engine(Cummins)

448kw(600hp)

supply power for dredge pump

Total fuel consumption≤89kg/hr
Extra emergency generator set22kw(30Hp)

 

5. Features:

 

Easy to assemble and dismantleAdvanced profssional design
Deliver by road, rail or seaSpare parts available
One man operationCompletely tested before deliverie
Advanced hydraulic systemwith air conditioning
Water cooled diesel enginesCustomizations on users'demand

 

6.Dredger Parts:

 

 

7. Production time:

 

Operators cabin and living room


Available in stock, or 120-160 working days if not available.

 

8.Cutter Suction Dredger Delivery:

 

Carried by trucks to the loading seaport, and then by bulk vessels to the destination seaport.

 

 

9. About Cutter Suction Dredger Customer

 

 

10. Small Sand Cutter Suction Dredger

 

Product Tags: cutterhead suction dredge   sand dredging machine  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Leader Dredger Co., Ltd
Subject:
Message:
Characters Remaining: (80/3000)