OEM Custom Aluminum Alloy Die Casting Auto Spare Parts Custom Die
Cast Aluminum Part Auto Spare Parts Custom Die Cast Aluminum Part | | CNC Turning, CNC Milling, Laser Cutting, Bending, Spaning, Wire
Cutting, Stamping, Electric Discharge Machining (EDM), Injection
Molding | | Aluminum: 2000 series,6000 series,7075,5052 etc | Stainlesss steel: SUS303,SUS304,SS316,SS316L,17-4PH etc | Steel: 1214L/1215/1045/4140/SCM440/40CrMo etc | Brass: 260, C360,H59,H60,H62,H63,H65,H68,H70,Bronze,Copper | Titanium: GradeF1-F5 | Plastic: Acetal/POM/PA/Nylon/PC/PMMA /PVC/PU/Acrylic/ABS/PTFE/PEEK
etc | | Anodize, Bead blasted, Silk Screen, PVD Plating, Zinc/Nickl
/Chrome/Titanium Plating, Brushing,Painting, Powder Coated, Passivation, Electrophoresis, Electro Polishing, Knurl,
Laser/Etch/Engrave etc | | +/-0.002~+/-0.005mm | | Min Ra0.1~3.2 | | Stp,Step,Igs,Xt,AutoCAD(DXF,DWG), PDF,or Samples | | 1-2 weeks for samples,3-4 weeks for mass production | | ISO9001:2015, SGS, RoHs, TUV | | Trade Assurance, TT/Paypal/WestUnion |
Application Of Custom Die Cast Aluminum Part - Use for machinery
- Use for electronic
- Use for automotive
- Use for information technology industry
- Use for Space industry
- Use for Medical industry
- Use for Energy industry
industrial, consumer, food processing, aviation, seals/gaskets,
lighting, packaging, filter, health care, telecommunications,
mechanical, water treatment, appliance, recreation, lawn and
garden, educational, oil and gas, government, construction,
plumbing, surveillance, pumps, marine, motors, gears, RFID tags,
electronics, and fasteners. FAQ: 1. Are you a manufacturer or a trading company? We are a 3000-square-meter factory located in Shenzhen, China.
2. How can I get a quote? Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and
surface treatment information.
3. Will my drawings be divulged if you benefit? No, we pay much attention to protect our customers’ privacy of
drawings, signing NDA is also accepted if need.
4. Can you provide samples before mass production? Sure, sample fee is needed, will be returned when mass production
if possible.
5. How about the lead time? Generally, 1-2 weeks for samples, 3-4 weeks for mass production.
6. How do you control the quality? (1)Material inspection--Check the material surface and roughly
dimension. (2)Production first inspection--To ensure the critical dimension in
mass production. (3)Sampling inspection--Check the quality before sending to the
warehouse. (4)Pre-shipment inspection--100% inspected by QC assistants before
shipment.
7. What will you do if we receive poor quality parts? Please kindly send us the pictures, our engineers will find the
solutions and remake them for you asap.
|