China Carbon Steel Pipe Elbow manufacturer
Cangzhou Xingkui Pipeline Equipment Co.,Ltd
Cangzhou Xingkui Pipeline Equipment Co.,Ltd
6
Home > Products > Carbon Steel Pipe Tee >

SCH 80 Carbon Steel Pipe Tee

Browse Categories

Cangzhou Xingkui Pipeline Equipment Co.,Ltd

City: cangzhou

Province/State:hebei

Country/Region:china

Tel:86-、-、

Contact Person:
Mr.Du
View Contact Details

SCH 80 Carbon Steel Pipe Tee

Brand Name YiHang
Model Number YH-3
Certification API/ISO
Place of Origin China
Minimum Order Quantity 1 pc
Price Negotiate
Payment Terms L/C, T/T
Supply Ability 5000 Tons/Month
Delivery Time 3-10 Days
Packaging Details Wooden box / Pallet
Application Pipe Lines Connecting
connection Butt Weld
Pipe Type Seamless
Keyword Tee
Wall thickness SCH20 SCH40 XS SCH80
Detailed Product Description

Sch 80 High Pressure Thick Wall And Custmosizd Carbon Steel Pipe Tee

Product Description:

 

Material: Carbon Steel: ASTM/ASME A234 WPB/WPC; A420 WPL6; ASTM A860 WPHY42/52 /60/65/70/75, ST37.0, ST35.8, ST45.8, 10CRMo910, 15CrMo, 12Cr1MoV,etc;
Standard: ASTM/JIS/DIN/BS/GB
ASME B16.9, ASME B16.28, MSS SP43, DIN2605,DIN2617,DIN2516,JISB2311,etc; or design as the clients' requests;
Usage:Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

 

OD1/2"-94"
WTsch5s,10s,40s,80s,std,xs,xxs,sch5-sch160
MaterialA234 WPB,A234 WPC ,A105,A181,A420 WPL6 and so on.
Applicationpetroleum, chemical industry, medicine, electric power, astronautics, war industry, fire prevention, metallurgy, shipbuilding, fuel gas, nuclear electricity, urban construction, hot-water heat and environmental protection etc.
CertificateISO9001:2000
StandardsANSI, DIN, JIS, BS, ISO, GB/T, JB, and so on
InspectionFactory in-house or third party inspection available upon request

Q1: What is your terms of payment?

A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.

 

Q2: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.

Q3: Could you produce according to the samples?
A : Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.

Q4: Could you provide the samples?
A: yes, we could provide the free samples on conditons it is available in stocks, however, the the transportation fee is borne by buyer.

Q5: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by Lenser piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.

 

Used To:

 

Used to the pipes connecting ,

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

 

Advantages And Characteristics:

Manufacter supplis strightly , of good quality and big quantity .

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etcUsed to the pipes connecting 

 

Product Tags: SCH 80 Carbon Steel Pipe Tee   A234 WPC Carbon Steel Pipe Tee   SCH 80 butt weld tee  
Related Products
Email to this supplier
 
From:
Enter your Email please.
To: Cangzhou Xingkui Pipeline Equipment Co.,Ltd
Subject:
Message:
Characters Remaining: (80/3000)